Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Ibn Sina

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Ibn Sina

Bitumen bathroom waterproofing in Ibn Sina starts with a photo of the floor and wall bases, sent by call or WhatsApp. The district has mixed residential units, commercial and small buildings, whose bathrooms need reliable protection before screed and tiles are laid.

Ibn Sina has old houses, modern flats and small apartment buildings with bathrooms that vary greatly in layout and height. A small bathroom in an older house may be damp-prone through its walls, while a modern flat may need comprehensive floor and corner protection. The photos show the existing surfaces and any damp or cracks needing first treatment, then bitumen is applied to protect the concrete before construction continues.

  • Ibn Sina is a district in Hofuf, near the industrial areas and Al Iskan, in the Eastern Province where summers are very hot and humidity is seasonal.
  • Bathroom floors in newer buildings require reliable waterproofing before screed, as water penetrates easily through tiny cracks.
What the service includes

What the service covers in Ibn Sina

  • Turning the layer up the walls in the wet zone and sealing the corners
  • Cleaning the surface and treating cracks and corners before application
  • Applying bitumen layers over the floor including the shower area
  • Confirming full drying before the screed is poured
How we work

How we carry out bitumen bathroom waterproofing in Ibn Sina

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Bitumen bathroom waterproofing in Ibn SinaWe choose the method and the materials once we know the condition of the spot.

Ibn Sina is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bitumen bathroom waterproofing in Ibn Sina

Is bitumen enough to waterproof a bathroom in an old house in Ibn Sina?

If the base concrete is sound and walls are not deeply cracked, yes. But we examine the photos first to see whether cracks and joints need treating before the bitumen is applied.

When can construction resume after bitumen waterproofing a bathroom?

This depends on the bitumen type and weather conditions. The photos and consultation will tell you how long the layer needs to dry before screed and tiles go down.

Is Ibn Sina within your service area?

Yes, Ibn Sina is one of the areas we work in, as are Sinaiyah Al Fawaziyah, Sinaiyah Ath Thuqbah and Al Iskan (near Al Khobar). To start, call us or message us on WhatsApp.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Nearby areas

Bitumen bathroom waterproofing near Ibn Sina

Nearby areas we also cover: Sinaiyah Al Fawaziyah, Sinaiyah Ath Thuqbah and Al Iskan (near Al Khobar).

Other services in the area

More services in Ibn Sina

Pool at night with water jets after waterproofing

Tell us about your site in Ibn Sina
and we will plan the next step with you

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp