
Bitumen bathroom waterproofing in Qurayyah
Bitumen bathroom waterproofing in Qurayyah starts with photos of the floor and walls, by phone or WhatsApp. This small hamlet has simple houses and villas whose bathrooms need a bitumen waterproof layer before tiling to protect concrete and foundations from water.
Qurayyah is a small hamlet with houses and villas of varying sizes, some built long ago and some newer. Every bathroom faces daily water flow from showering and cleaning, and excess water may seep through screed and tiles to the foundations. In such hamlets, protection from leaks is essential because repairing damage from it can be costly and difficult. Bitumen is laid before tiles and forms a continuous barrier on floors and walls.
- A small hamlet in the Eastern Province, close to Al Wahah, Qurtubah and Ar Rabwah, made up of scattered houses and villas.
- Water seepage from a rural bathroom can damage concrete foundations and walls over time if not prevented.
What the service covers in Qurayyah
- Confirming full drying before the screed is poured
- Closing the waterproofing around drain openings and pipe entries
- Applying bitumen layers over the floor including the shower area
- Turning the layer up the walls in the wet zone and sealing the corners
From first contact to the finished job in Qurayyah
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.
Qurayyah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
Start from Qurayyah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in Qurayyah
What is the difference between waterproofing a new bathroom and an old one in a hamlet?
In a new bathroom bitumen is applied directly to clean concrete before screed and tiles. In an old one the floor may need cleaning and old tiles removed first. Photos show which situation you have and what exactly is needed.
Does bitumen last long in a hamlet bathroom?
Yes, when applied to a sound floor and covered with tight tiling and grout, bitumen provides lasting protection. Regular cleaning and good ventilation extend its life.
How do I know the bathroom was not properly waterproofed before?
Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.
Why does bitumen need screed over it before tiling?
Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.
What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?
Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.
Do you offer bitumen bathroom waterproofing in Qurayyah?
Yes. Qurayyah is within our service area in the Eastern Province, and we also work in Al Wahah (near Qaryah al Ulya), Qurtubah (near Qaryah al Ulya) and Ar Rabwah (near Qaryah al Ulya). Call us or send photos of the spot on WhatsApp.
Bitumen bathroom waterproofing near Qurayyah
We also offer bitumen bathroom waterproofing in Al Wahah (near Qaryah al Ulya), Qurtubah (near Qaryah al Ulya) and Ar Rabwah (near Qaryah al Ulya), among the closest areas to Qurayyah.
More services in Qurayyah




