Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Mulayjah

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Mulayjah

Bitumen bathroom waterproofing in Mulayjah starts with photos of the bathroom floor and wall bases, sent by call or WhatsApp. The town lies close to Nita, As Sudayrah and Al Kahafah, and includes family homes that vary in age and finish.

Mulayjah has family homes alongside newer ones, and its bathrooms differ in finish and floor age. In older bathrooms, dampness often appears at the wall bases and where the floor meets the drain, while newer ones may only need joints treated before tiling. Bitumen depends on a clean, dry surface, and the photos show whether the floor is ready.

  • Mulayjah is a town in the Al-Ahsa governorate of the Eastern Province, lying close to Nita and As Sudayrah.
  • Dampness often shows first at wall bases where the floor meets the wall and drain.
What the service includes

The scope of the work in Mulayjah

  • Turning the layer up the walls in the wet zone and sealing the corners
  • Checking the concrete floor and wall bases and identifying cracks
  • Closing the waterproofing around drain openings and pipe entries
  • Applying bitumen layers over the floor including the shower area
How we work

From first contact to the finished job in Mulayjah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

We serve Mulayjah and around itIncluding Nita, As Sudayrah and Al Kahafah, as part of our work across the Eastern Province.

Start from Mulayjah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Mulayjah

Is bitumen suitable for an old bathroom floor in Mulayjah?

Often yes, if the floor is sound, clean and dry, with cracks treated before the layer goes on. If the damage is widespread, the photos will show it.

Do you treat wall bases in the town before tiling?

Yes, we check the wall base together with the floor, since dampness often starts there. Send clear photos of the corner and the drain.

How do I request bitumen bathroom waterproofing in Mulayjah?

Call us, or send clear photos of the spot and its location in Mulayjah on WhatsApp, and we will work out the next step with you.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Nearby areas

The same service in nearby areas

We also offer bitumen bathroom waterproofing in Nita, As Sudayrah and Al Kahafah, among the closest areas to Mulayjah.

Other services in the area

More services in Mulayjah

Pool at night with water jets after waterproofing

We start with you in Mulayjah
with one call

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp