Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Mulayjah

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Mulayjah

Bathroom waterproofing before tiling in Mulayjah starts with photos of the floor and the walls around the shower, sent by call or WhatsApp. The town has family homes and scattered houses, and the protective layer goes on before adhesive and tiles in every case.

Mulayjah has family homes and scattered houses, and many were built in stages, so the bathrooms on the ground floor and upper floors can differ in type and condition. A floor tiled without a protective layer shows dampness behind the tiles after a while, so the layer goes on the floor and around the shower first. The photos decide whether the walls need full coverage or treatment of particular spots.

  • Mulayjah is a town in the Eastern Province, near Nita, As Sudayrah and Al Kahafah, with family homes and scattered houses.
  • Tiles stuck over a damp floor lift at the edges over time, so the base is waterproofed first.
What the service includes

The scope of the work in Mulayjah

  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Forming and treating the floor-to-wall corners before the main layer
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Applying the membrane over the full floor and up the walls in the wet zone
How we work

This is how we work in Mulayjah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

We serve Mulayjah and around itIncluding Nita, As Sudayrah and Al Kahafah, as part of our work across the Eastern Province.

Mulayjah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing before tiling in Mulayjah

Is an upper-floor bathroom in Mulayjah waterproofed the same way as a ground-floor one?

The principle is the same, but the photos reveal differences in condition. Upper-floor bathrooms are often affected by leaks from below, so we check the floor and shared walls before choosing the treatment.

Must old tiles be removed before waterproofing a bathroom in Mulayjah?

That depends on the old tiles and the floor beneath. If they are firmly bonded, cleaning may be enough; if they are hollow, they must come off, and the photos will tell us which applies.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

How do I request bathroom waterproofing before tiling in Mulayjah?

Call us, or send clear photos of the spot and its location in Mulayjah on WhatsApp, and we will work out the next step with you.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

Nearby areas

Areas near Mulayjah

Nearby areas we also cover: Nita, As Sudayrah and Al Kahafah.

Other services in the area

More services in Mulayjah

Worker applying the white insulation layer on a villa roof by the sea

Your first step in Mulayjah:
a call or a WhatsApp message

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp