
Bitumen bathroom waterproofing in King Faisal University
Bitumen bathroom waterproofing in King Faisal University starts with photos sent by WhatsApp or call. The district has multiple university and residential buildings with many bathrooms in facilities and accommodation needing water protection before finishing to ensure no leaks.
King Faisal University is a relatively new development with diverse buildings including halls, offices and accommodation, with shared bathrooms and private ones. A bathroom in an institutional building may face heavy use and need stronger waterproofing, while one in accommodation faces different conditions. Bitumen protects the floor and walls from inside before tiling and finishes, ensuring water does not penetrate to the base or lower layers. Photos help assess the surface condition and the nature of the construction.
- King Faisal University is an educational district in the Eastern Province, near Al Fanar, As Saif and An Nawras, with modern university and residential buildings.
- A bathroom serving many users needs reliable waterproofing that tolerates intense moisture and repeated use.
What the service covers in King Faisal University
- Cleaning the surface and treating cracks and corners before application
- Confirming full drying before the screed is poured
- Turning the layer up the walls in the wet zone and sealing the corners
- Applying bitumen layers over the floor including the shower area
This is how we work in King Faisal University
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.
King Faisal University is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
Your request from King Faisal University comes to usCall or WhatsApp on one number, and we answer you ourselves.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Before you book bitumen bathroom waterproofing in King Faisal University
Does waterproofing differ between shared and private bathrooms in university accommodation?
The basic method is the same, but a shared bathroom with heavy use may need stronger waterproofing or additional drainage treatment. Photos and information about user numbers help determine the level of protection required.
How can bitumen be applied in a bathroom in an active university building without disrupting its use?
If the bathroom is being fully renovated, we apply bitumen during the renovation. If the building is in active use, options are limited and may require coordination with management and scheduling to avoid disruption. Discuss the situation with us so we can suggest the most suitable approach.
How do I request bitumen bathroom waterproofing in King Faisal University?
Call us, or send clear photos of the spot and its location in King Faisal University on WhatsApp, and we will work out the next step with you.
Is bitumen right for bathroom walls as well as the floor?
Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.
Why does bitumen need screed over it before tiling?
Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.
Does the bathroom need ventilation while bitumen is applied?
Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.
More services in King Faisal University




