
Bitumen bathroom waterproofing in An Nawras
Bitumen bathroom waterproofing in An Nawras starts with WhatsApp messages containing photos of the floor, walls and around pipes. The district has residential buildings and villas, many of whose bathrooms need waterproofing before re-tiling or to stop an existing leak. Bitumen protects concrete and base from water seeping through.
Bathrooms in An Nawras range from new to old, and the district's nearness to the coast and port may increase humidity. Bitumen is laid on the floor and lower walls before sand and tiles, and the width of coverage depends on the bathroom's size and where pipes are. Photos of the floor, corners and outlets help us figure out the material needed and the right method.
- An Nawras is a district in the Eastern Province, near Al Fanar, King Faisal University and King Abdul Aziz Seaport.
- A bathroom near the coast faces higher humidity, so waterproofing must be thorough before tiling.
The bitumen bathroom waterproofing work in An Nawras
- Turning the layer up the walls in the wet zone and sealing the corners
- Closing the waterproofing around drain openings and pipe entries
- Cleaning the surface and treating cracks and corners before application
- Checking the concrete floor and wall bases and identifying cracks
The stages of the work in An Nawras
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.
Bitumen bathroom waterproofing in An NawrasWe choose the method and the materials once we know the condition of the spot.
Start from An Nawras with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Before you book bitumen bathroom waterproofing in An Nawras
Is bitumen enough for a bathroom near the sea in An Nawras?
Bitumen protects from flowing water and direct dampness. High coastal humidity raises the need for thorough, well-fitted waterproofing. Photos show whether other problems need extra steps.
Does bitumen work in a below-ground bathroom near the port in An Nawras?
Yes, bitumen protects from water and ground dampness. A below-ground bathroom near the coast means higher humidity, so waterproofing must be complete. Send photos of the bathroom and its level relative to the ground.
How do I know the bathroom was not properly waterproofed before?
Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.
Does the bathroom need ventilation while bitumen is applied?
Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.
How do I request bitumen bathroom waterproofing in An Nawras?
Call us, or send clear photos of the spot and its location in An Nawras on WhatsApp, and we will work out the next step with you.
Why does bitumen need screed over it before tiling?
Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.
We also offer it in neighbouring areas
We also work near An Nawras, in Al Fanar, King Faisal University and King Abdul Aziz Seaport.
More services in An Nawras




