Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Ibn Lughaysim

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Ibn Lughaysim

Bitumen bathroom waterproofing in Ibn Lughaysim begins with photos of the floor and wall bases, sent by call or WhatsApp. It is a small settlement of standalone homes, and the bitumen treats the floor before the screed and tiles go down.

Homes in small villages are usually standalone with simple construction, and bathrooms may have been built with unlined floors or only limited lining. Dampness tends to appear in the floor corners and at the drain outlet, so the treatment concentrates there. The photos show whether the work is full lining or repair of specific points.

  • Ibn Lughaysim is a small village in the Eastern Province, close to An Nayfiyah, King Khalid Military City and Al Qalt.
  • In standalone homes, thin or earthen-backed floors are a common source of damp rising beneath tiles.
What the service includes

The bitumen bathroom waterproofing work in Ibn Lughaysim

  • Turning the layer up the walls in the wet zone and sealing the corners
  • Confirming full drying before the screed is poured
  • Applying bitumen layers over the floor including the shower area
  • Closing the waterproofing around drain openings and pipe entries
How we work

How we carry out bitumen bathroom waterproofing in Ibn Lughaysim

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Ibn Lughaysim is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We serve Ibn Lughaysim and around itIncluding An Nayfiyah (near King Khālid Military City), King Khālid Military City and Al Qalt, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bitumen bathroom waterproofing in Ibn Lughaysim

Can old bathrooms in Ibn Lughaysim be waterproofed without demolition?

Often the bathroom can be treated from above after removing only the damaged tiles. The photos will show whether that works or wider removal is needed.

Does the work cover walls or only the floor?

Bitumen focuses on the floor and the wall bases where they meet. If dampness climbs higher, we will tell you once the photos have been reviewed.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

How do I request bitumen bathroom waterproofing in Ibn Lughaysim?

Call us, or send clear photos of the spot and its location in Ibn Lughaysim on WhatsApp, and we will work out the next step with you.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: An Nayfiyah (near King Khālid Military City), King Khālid Military City and Al Qalt.

Other services in the area

More services in Ibn Lughaysim

Pool at night with water jets after waterproofing

Tell us about your site in Ibn Lughaysim
and we will plan the next step with you

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp