Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Hajr

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Hajr

Bitumen bathroom waterproofing in Hajr begins with photos sent via WhatsApp or call showing the floor and walls. Hajr has older and newer villas and blocks, and the bathroom needs strong protection before tiles and screed.

Hajr mixes older and newer villas and blocks in the same area. Bathrooms in older buildings may have suffered long-term dampness and past leaks, so the concrete may be weak or the walls damp. Newer bathrooms may only need standard waterproofing before new finishing. Bitumen provides a strong barrier on the floor and lower walls and adapts to the high temperatures and coastal humidity in the area. Photos show the building's condition before any choice is made.

  • Hajr is a district in the Eastern Province near Tihamah and Qasr Al Khalij, with older and newer villas and residential blocks.
  • Bathrooms in older buildings in Hajr may need damp removal and drying before bitumen application to ensure good adhesion and protection.
What the service includes

The scope of the work in Hajr

  • Closing the waterproofing around drain openings and pipe entries
  • Cleaning the surface and treating cracks and corners before application
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Applying bitumen layers over the floor including the shower area
How we work

This is how we work in Hajr

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Start from Hajr with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Bitumen bathroom waterproofing in HajrWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bitumen bathroom waterproofing in Hajr

Can a damp old bathroom in Hajr be waterproofed with bitumen alone?

If there is old dampness or a past leak we may first need to treat the moisture and dry the surface well before applying bitumen. Photos show the extent of dampness and whether prior treatment is needed.

Does coastal humidity in Hajr affect bitumen waterproofing?

Yes, high humidity especially near coasts can slow bitumen drying and affect its adhesion if not applied correctly. We choose the right method and timing based on photos and local conditions.

What should I send you from Hajr?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Hajr, and we will work out the next step with you.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Nearby areas

The same service in nearby areas

If the site is outside Hajr, the same service is available in Tihamah, Qasr Al Khalij and Al Ferdous (near Dammam).

Other services in the area

More services in Hajr

Pool at night with water jets after waterproofing

In Hajr and need bitumen bathroom waterproofing?
Send us photos of the spot

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp