Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Down Town

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Down Town

Bitumen bathroom waterproofing in Down Town begins with WhatsApp photos of the floor and walls. The district has old and newer buildings with bathrooms of varying sizes and designs, each requiring careful assessment before the bitumen coating is applied.

Down Town has older residential and commercial buildings where bathrooms vary in construction condition and dampness. Some may show leaks through walls or under the floor if the structure is old, or may need preventive waterproofing before new installation. Bitumen is laid on the floor and walls to a certain height before screeding and tiling; the surface must be cleaned and cracks repaired first. Photos help us see the bathroom's state and whether there are underlying problems.

  • Down Town is a district in Hofuf in the Eastern Province, next to Ar Rafiah, Al Zuhur and Al Andalus, with old and mid-aged buildings.
  • A bathroom in an older building needs careful inspection of cracks and joints before bitumen is applied, because leaks may be deep-rooted.
What the service includes

What we do for you in Down Town

  • Closing the waterproofing around drain openings and pipe entries
  • Checking the concrete floor and wall bases and identifying cracks
  • Applying bitumen layers over the floor including the shower area
  • Turning the layer up the walls in the wet zone and sealing the corners
How we work

The stages of the work in Down Town

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Your request from Down Town comes to usCall or WhatsApp on one number, and we answer you ourselves.

Bitumen bathroom waterproofing in Down TownWe choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bitumen bathroom waterproofing in Down Town

Can an old bathroom in Down Town be waterproofed without removing the old tiles first?

Yes, but if there is current leaking, the old tiles and bitumen must be removed to see the surface and confirm the concrete is sound. Photos help us decide whether removal is necessary.

How long does bitumen waterproofing take in a Down Town bathroom?

Duration depends on bathroom size and surface condition. After cleaning and crack repair, bitumen is applied and left to cure before screed and tiling. Send photos so we can estimate better.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Do you cover Down Town?

Yes. We serve Down Town and nearby areas such as Ar Rafiah, Al Zuhur (near Ar Rafiah) and Al Andalus (near Ar Rafiah), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

Nearby areas

Areas near Down Town

Nearby areas we also cover: Ar Rafiah, Al Zuhur (near Ar Rafiah) and Al Andalus (near Ar Rafiah).

Other services in the area

More services in Down Town

Pool at night with water jets after waterproofing

In Down Town and need bitumen bathroom waterproofing?
Send us photos of the spot

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp