Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Zuhur (near Ar Rafiah)

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Zuhur (near Ar Rafiah)

Ab Raj Al Azl provides bitumen bathroom waterproofing in Al Zuhur, starting with photos of the floor and wall bases sent by call or WhatsApp. Bitumen goes on before the screed and tiling to stop water from reaching what lies beneath.

Al Zuhur has scattered houses, villas and relatively recent residential buildings, and many of their bathrooms share a similar design. In newer bathrooms dampness tends to appear where the floor meets the walls and sometimes around the floor drain. The photos establish whether the job is a lining renewal or a new application before screed.

  • Al Zuhur is a residential district in Al-Ahsa in the Eastern Province, close to Ar Rafiah, Ghirnatah and Al Andalus.
  • Damp usually travels from the small joints between floor and wall.
What the service includes

The bitumen bathroom waterproofing work in Al Zuhur (near Ar Rafiah)

  • Applying bitumen layers over the floor including the shower area
  • Cleaning the surface and treating cracks and corners before application
  • Closing the waterproofing around drain openings and pipe entries
  • Turning the layer up the walls in the wet zone and sealing the corners
How we work

How we carry out bitumen bathroom waterproofing in Al Zuhur (near Ar Rafiah)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Al Zuhur (near Ar Rafiah) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Your request from Al Zuhur (near Ar Rafiah) comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bitumen bathroom waterproofing in Al Zuhur (near Ar Rafiah)

Does bitumen work in modern bathrooms in Al Zuhur?

It works in many cases before screed and tiling, provided the floor is sound. The photos reveal the actual state of the bathroom.

How long does the work take in an Al Zuhur bathroom?

Timing varies with the bathroom size, its condition and the method chosen. We confirm it after reviewing the photos of that specific bathroom.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Do you offer bitumen bathroom waterproofing in Al Zuhur (near Ar Rafiah)?

Yes. Al Zuhur (near Ar Rafiah) is within our service area in the Eastern Province, and we also work in Ar Rafiah, Ghirnatah (near Ar Rafiah) and Al Andalus (near Ar Rafiah). Call us or send photos of the spot on WhatsApp.

Nearby areas

Bitumen bathroom waterproofing near Al Zuhur (near Ar Rafiah)

We also offer bitumen bathroom waterproofing in Ar Rafiah, Ghirnatah (near Ar Rafiah) and Al Andalus (near Ar Rafiah), among the closest areas to Al Zuhur (near Ar Rafiah).

Other services in the area

More services in Al Zuhur (near Ar Rafiah)

Pool at night with water jets after waterproofing

Bitumen bathroom waterproofing in Al Zuhur (near Ar Rafiah)?
Call us now

Call us or send photos of the floor, the pipe entries and the wall bases on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp