Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Az Zarah

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Az Zarah

Bitumen bathroom waterproofing in Az Zarah begins with photos sent by call or WhatsApp showing the bathroom floor and walls. The district has varied homes, each needing moisture protection before tiling is installed.

Az Zarah is a residential district with homes and villas of various styles and sizes, many of them older and needing protection renewed. Floors and wall bases face water and steam daily, and unprotected concrete absorbs moisture causing tiles to crack and water to leak. Bitumen applied before tiling protects concrete and the structure below. Photos show the surface condition and whether cracks or damage need initial repair.

  • Az Zarah is a residential district in the Eastern Province, close to An Narjis and Al Awwamiyah, with homes and villas of varied ages and sizes.
  • Older buildings in the district have bathrooms needing fresh moisture protection before tiles are renewed.
What the service includes

What the service covers in Az Zarah

  • Checking the concrete floor and wall bases and identifying cracks
  • Closing the waterproofing around drain openings and pipe entries
  • Confirming full drying before the screed is poured
  • Turning the layer up the walls in the wet zone and sealing the corners
How we work

The stages of the work in Az Zarah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Bitumen bathroom waterproofing in Az ZarahWe choose the method and the materials once we know the condition of the spot.

Your request from Az Zarah comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bitumen bathroom waterproofing in Az Zarah

Can an old bathroom in Az Zarah have its waterproofing renewed despite existing old tiles?

To renew waterproofing, old tiles must be removed first, then the surface cleaned and concrete checked. If concrete is sound, new bitumen goes on. Send photos so we can assess the tile condition and what is underneath.

What causes water leaks in an old bathroom in a house in Az Zarah?

An old bathroom without waterproofing or with worn-out sealing lets water into concrete and walls. New bitumen stops this path. Photos will show us the leak source precisely.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

How do I request bitumen bathroom waterproofing in Az Zarah?

Call us, or send clear photos of the spot and its location in Az Zarah on WhatsApp, and we will work out the next step with you.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Nearby areas

The same service in nearby areas

We also offer bitumen bathroom waterproofing in An Narjis, Al Awwamiyah and Al Husain, among the closest areas to Az Zarah.

Other services in the area

More services in Az Zarah

Pool at night with water jets after waterproofing

Bitumen bathroom waterproofing in Az Zarah?
Call us now

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp