
Bitumen bathroom waterproofing in Al Awwamiyah
Bitumen bathroom waterproofing in Al Awwamiyah starts with a WhatsApp message containing photos of the bathroom, floor condition and walls. The town has houses and villas with bathrooms of varying ages, many needing a waterproof layer before screed and tiling. Bitumen creates an effective water barrier under the floor and wall base before final installation.
Al Awwamiyah has older and newer houses, with bathrooms varying in design and condition. Older floors may have cracks in the concrete beneath them or rising damp, and walls may show moisture marks at corners and pipe entries. Bitumen is applied to a clean surface after removing what is there, covering the floor and base to a set height on the walls. Photos clarify each bathroom's state and help choose the right method.
- Al Awwamiyah is a town in the Eastern Province, close to An Narjis, Al Jumaimah and Az Zarah, with simple houses and villas.
- Bathrooms in older houses often show rising damp because concrete floors absorb water without a barrier underneath.
What we do for you in Al Awwamiyah
- Turning the layer up the walls in the wet zone and sealing the corners
- Confirming full drying before the screed is poured
- Closing the waterproofing around drain openings and pipe entries
- Cleaning the surface and treating cracks and corners before application
The stages of the work in Al Awwamiyah
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.
Al Awwamiyah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
Start from Al Awwamiyah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
Your questions on bitumen bathroom waterproofing in Al Awwamiyah
When should bitumen be applied to a bathroom floor before rebuilding it?
After removing the old floor and base and cleaning the surface, before laying new screed or cement. Bitumen forms the first barrier against water and damp, then other layers are added on top.
Is bitumen alone enough or does it need other layers in Al Awwamiyah?
Bitumen is the base layer and main water barrier. Other layers such as cement and modern products follow, depending on the condition. Photos help us decide whether additional layers are needed.
Why does bitumen need screed over it before tiling?
Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.
What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?
Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.
How do I know the bathroom was not properly waterproofed before?
Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.
Do you offer bitumen bathroom waterproofing in Al Awwamiyah?
Yes. Al Awwamiyah is within our service area in the Eastern Province, and we also work in An Narjis, Al Jumaimah and Az Zarah. Call us or send photos of the spot on WhatsApp.
Areas near Al Awwamiyah
If the site is outside Al Awwamiyah, the same service is available in An Narjis, Al Jumaimah and Az Zarah.
More services in Al Awwamiyah




