Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Ath Thuraiya

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Ath Thuraiya

Bitumen waterproofing of bathrooms in Ath Thuraiya begins with WhatsApp photos of the floor, walls and corners. Ath Thuraiya comprises varied houses and villas, and bathrooms need bitumen protection before tiling to prevent damp and seepage.

Villas and houses in Ath Thuraiya vary in size and age, some new and some built years ago. Older bathrooms usually show chronic damp and cracks around pipes and corners, while newer ones may need bitumen as preventive protection. Concrete under tiles is exposed to seeping water from daily use, and bitumen forms a strong barrier. Photos determine the existing damp level and cracks needing treatment before bitumen application.

  • Ath Thuraiya is a district in the Eastern Province, near Ar Rif, An Narjis and Al Awwamiyah, comprising scattered houses and villas.
  • Bathrooms in older houses accumulate damp due to poor ventilation and narrow pipes.
What the service includes

The main items of bitumen bathroom waterproofing in Ath Thuraiya

  • Applying bitumen layers over the floor including the shower area
  • Confirming full drying before the screed is poured
  • Closing the waterproofing around drain openings and pipe entries
  • Turning the layer up the walls in the wet zone and sealing the corners
How we work

This is how we work in Ath Thuraiya

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Bitumen bathroom waterproofing in Ath ThuraiyaWe choose the method and the materials once we know the condition of the spot.

Start from Ath Thuraiya with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bitumen bathroom waterproofing in Ath Thuraiya

Does bitumen solve foul odours in a damp bathroom?

Bitumen prevents water seepage, reducing the damp and decay causing odour. But if the smell is from pipes or ventilation, additional work may be needed. Photos help identify the source.

Can bitumen be applied to a bathroom floor with exposed pipes?

Yes, but the area around pipes must be thoroughly cleaned and gaps sealed before bitumen is applied. Bitumen is applied carefully around each connection point. Send photos showing pipe locations.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

What should I send you from Ath Thuraiya?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Ath Thuraiya, and we will work out the next step with you.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Nearby areas

Areas near Ath Thuraiya

Nearby areas we also cover: Ar Rif, An Narjis and Al Awwamiyah.

Other services in the area

More services in Ath Thuraiya

Pool at night with water jets after waterproofing

In Ath Thuraiya and need bitumen bathroom waterproofing?
Send us photos of the spot

Call us or send photos of the floor, the pipe entries and the wall bases on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp