Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Ath Thuqbah

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Ath Thuqbah

Bitumen bathroom waterproofing in Ath Thuqbah starts with photos of the floor and wall bases, sent by call or WhatsApp. The district is made of homes and residential buildings near industrial areas, where bathrooms are lined before screed and tiling.

Ath Thuqbah contains homes and residential buildings near an industrial zone, with some buildings older and some more recently built. Older bathrooms show gaps at the floor and around the drain, requiring lining before tiling, while newer bathrooms usually have a more serviceable layer. Lining conditions depend on the nature of the floor and how it was originally laid, which the photos reveal before any decision is made.

  • Ath Thuqbah is a residential district in the Eastern Province, near Al Khubar Al Janubiyah, Sinaiyah Ath Thuqbah and Al Iskan, with homes and residential buildings.
  • Bathroom floors need an intact layer beneath the screed, since any breach lets water pass to what lies below.
What the service includes

What we do for you in Ath Thuqbah

  • Confirming full drying before the screed is poured
  • Checking the concrete floor and wall bases and identifying cracks
  • Cleaning the surface and treating cracks and corners before application
  • Applying bitumen layers over the floor including the shower area
How we work

This is how we work in Ath Thuqbah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Ath Thuqbah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Start from Ath Thuqbah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bitumen bathroom waterproofing in Ath Thuqbah

Are Ath Thuqbah bathrooms lined before the tiles go in?

Yes, that is the right moment for bitumen lining. If the tiles are already down, the photos will show whether lining is possible without retiling the whole floor.

How do older bathrooms in Ath Thuqbah differ from newer ones for lining?

The older ones usually need gaps and drains dealt with first, while newer ones tend to have a more serviceable layer. The photos show which applies to your bathroom.

Do you cover Ath Thuqbah?

Yes. We serve Ath Thuqbah and nearby areas such as Al Khubar Al Janubiyah, Sinaiyah Ath Thuqbah and Al Iskan (near Al Khobar), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Nearby areas

We also offer it in neighbouring areas

We also offer bitumen bathroom waterproofing in Al Khubar Al Janubiyah, Sinaiyah Ath Thuqbah and Al Iskan (near Al Khobar), among the closest areas to Ath Thuqbah.

Other services in the area

More services in Ath Thuqbah

Pool at night with water jets after waterproofing

We start with you in Ath Thuqbah
with one call

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp