Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Ash Shihiyah

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Ash Shihiyah

Bitumen bathroom waterproofing in Ash Shihiyah begins with photos of the floor and corners, sent by WhatsApp or call. The village has scattered houses and villas, where the bathroom needs a waterproof layer before tiles and screed.

Ash Shihiyah has houses of different ages, from older buildings to modern villas, each with varied bathroom conditions. An old house may suffer long-term seepage penetrating the foundation, while a new one needs waterproofing from the start. The bathroom faces high humidity daily from hot and cold water use, and bitumen prevents water from seeping into the layers below. Clear photos of the floor, joints and lower walls help us choose the right method.

  • Ash Shihiyah is a village in the Eastern Province, close to Al Wahah, Al Majd and Al Wurud, made up of scattered houses and villas.
  • Daily bathroom use accumulates moisture around joints and lower corners, where seepage starts if no barrier is in place.
What the service includes

The main items of bitumen bathroom waterproofing in Ash Shihiyah

  • Checking the concrete floor and wall bases and identifying cracks
  • Cleaning the surface and treating cracks and corners before application
  • Confirming full drying before the screed is poured
  • Turning the layer up the walls in the wet zone and sealing the corners
How we work

The stages of the work in Ash Shihiyah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Bitumen bathroom waterproofing in Ash ShihiyahWe choose the method and the materials once we know the condition of the spot.

We serve Ash Shihiyah and around itIncluding Al Wahah (near Ash Shihiyah), Al Majd and Al Wurud (near Ash Shihiyah), as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bitumen bathroom waterproofing in Ash Shihiyah

Can an old bathroom be waterproofed with bitumen without removing the old tiles?

If the old tiles are sound and firmly bonded, we may be able to work around them. But photos will show if there is bubbling or separation beneath the tiles, meaning water has already entered; we would need to remove them first.

How long does bitumen bathroom waterproofing take in Ash Shihiyah?

That depends on the floor condition, joints and bathroom size. The photos and first call help us understand the situation, and we will then tell you what we plan to do and how it will proceed.

How do I request bitumen bathroom waterproofing in Ash Shihiyah?

Call us, or send clear photos of the spot and its location in Ash Shihiyah on WhatsApp, and we will work out the next step with you.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Al Wahah (near Ash Shihiyah), Al Majd and Al Wurud (near Ash Shihiyah).

Other services in the area

More services in Ash Shihiyah

Pool at night with water jets after waterproofing

Your first step in Ash Shihiyah:
a call or a WhatsApp message

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp