Bitumen bathroom waterproofing in Al Majd

Bitumen bathroom waterproofing in Al Majd starts with photos of the floor and wall bases, sent by call or WhatsApp. We serve Al Majd, a district in the Eastern Province that lies close to Al Wahah and Ash Shihiyah, and the work is planned from what the photos show.

Al Majd is mostly made up of houses and villas, and in many of them the bathroom sits on an upper floor above the living rooms. A leak from the floor there can show first as a stain on a ceiling or a wall in the room below, well before anyone sees water in the bathroom itself. For that reason the wall bases, the drain corners and the joints where the floor meets the wall are checked closely. The photos show whether the existing layer can stay or needs to come out.

  • Al Majd is a district in the Eastern Province, close to Al Wahah, Ash Shihiyah and Al Wurud, with housing in the main.
  • A bathroom above a living room often hides its leak under the ceiling, so the effect is checked first.
What the service includes

What the service covers in Al Majd

  • Cleaning the surface and treating cracks and corners before application
  • Applying bitumen layers over the floor including the shower area
  • Closing the waterproofing around drain openings and pipe entries
  • Confirming full drying before the screed is poured
How we work

The stages of the work in Al Majd

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

We serve Al Majd and around itIncluding Al Wahah (near Ash Shihiyah), Ash Shihiyah and Al Wurud (near Ash Shihiyah), as part of our work across the Eastern Province.

Al Majd is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bitumen bathroom waterproofing in Al Majd

Can a bathroom above a living room be waterproofed from the top?

The floor is treated from the bathroom side, so the work happens above the room below. The photos show the ceiling and the wall bases, and we will tell you whether a stain below means the floor or a pipe connection.

Which parts of an Al Majd bathroom are checked first?

The wall bases, the drain corners and the joints where floor meets wall are checked first, because water usually travels from them. Send clear photos of each, and the photos will decide what is needed.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Is Al Majd within your service area?

Yes, Al Majd is one of the areas we work in, as are Al Wahah (near Ash Shihiyah), Ash Shihiyah and Al Wurud (near Ash Shihiyah). To start, call us or message us on WhatsApp.

Nearby areas

We also offer it in neighbouring areas

We also work near Al Majd, in Al Wahah (near Ash Shihiyah), Ash Shihiyah and Al Wurud (near Ash Shihiyah).

Other services in the area

More services in Al Majd

Pool at night with water jets after waterproofing

In Al Majd and need bitumen bathroom waterproofing?
Send us photos of the spot

Describe the problem and where it is in Al Majd, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp