Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Ash Sheraa

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Ash Sheraa

Bitumen bathroom waterproofing is carried out in Ash Sheraa, Al Ahsa, to protect the floor and lower walls before tiling. Send bathroom photos by call or WhatsApp and we will identify the right step.

Ash Sheraa is made up of terraced homes and detached houses, lying close to Al Amwaj and As Sawari. Interior bathrooms in terraced homes often share a wall that is more exposed to water seeping from the neighbouring bathroom. For that reason the shared wall base is checked closely before bitumen is applied.

  • Ash Sheraa is a residential district in Al Ahsa Governorate, in the Eastern Province, lying near Ar Raja, Al Amwaj and As Sawari.
  • A wall base shared by two adjacent bathrooms needs particular care because it takes water from both sides.
What the service includes

What we do for you in Ash Sheraa

  • Cleaning the surface and treating cracks and corners before application
  • Applying bitumen layers over the floor including the shower area
  • Confirming full drying before the screed is poured
  • Checking the concrete floor and wall bases and identifying cracks
How we work

The stages of the work in Ash Sheraa

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

We serve Ash Sheraa and around itIncluding Ar Raja, Al Amwaj and As Sawari (near Dhahran), as part of our work across the Eastern Province.

Bitumen bathroom waterproofing in Ash SheraaWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bitumen bathroom waterproofing in Ash Sheraa

Can a bathroom in a terraced home in Ash Sheraa be waterproofed?

Yes, we work in terraced homes with attention to the shared wall. Send photos of the floor and neighbouring wall so we can see how the treatment should be applied.

Is bitumen suitable for older bathrooms in Ash Sheraa?

Often yes, if the floor is sound and free of dust; a cracked floor needs repair first. The photos will decide this.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Do you cover Ash Sheraa?

Yes. We serve Ash Sheraa and nearby areas such as Ar Raja, Al Amwaj and As Sawari (near Dhahran), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

We also offer it in neighbouring areas

We also work near Ash Sheraa, in Ar Raja, Al Amwaj and As Sawari (near Dhahran).

Other services in the area

More services in Ash Sheraa

Pool at night with water jets after waterproofing

In Ash Sheraa and need bitumen bathroom waterproofing?
Send us photos of the spot

Call us or send photos of the floor, the pipe entries and the wall bases on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp