Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Amwaj

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Amwaj

Bitumen bathroom waterproofing in Al Amwaj begins with a photo of the floor and lower walls to be protected, sent by call or WhatsApp. The district is mainly newer residential buildings, and their bathrooms need strong bitumen protection before finishing.

Al Amwaj is a relatively new district with mostly newer buildings, and bathrooms in homes and apartment blocks were built fairly recently. Despite newer construction, bathrooms face daily water splash and high humidity, and applying bitumen before screed and tiles ensures long-term protection. Finishing conditions vary; some bathrooms may be rough with no prior treatment while others have initial materials laid. Photos show the current state and we determine the right application method with you.

  • Al Amwaj is a district in the Eastern Province, close to As Sufun, Ash Sheraa and Al Loaloa.
  • A modern bathroom needs bitumen waterproofing before tiling to prevent water seeping through the floor and lower walls to layers below.
What the service includes

What we do for you in Al Amwaj

  • Confirming full drying before the screed is poured
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Applying bitumen layers over the floor including the shower area
  • Closing the waterproofing around drain openings and pipe entries
How we work

How we carry out bitumen bathroom waterproofing in Al Amwaj

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Al Amwaj is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Start from Al Amwaj with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Amwaj

Is bitumen necessary in a new, unused bathroom in Al Amwaj?

Yes, even a new bathroom needs protection before tiles are laid. Bitumen is applied to the floor and lower walls before screed and tiles, because water will inevitably seep when in use. Send photos of the bathroom in its current state so we can assess your needs.

Can bitumen be applied to a rough floor or must it be levelled first?

It depends on how rough. If the floor has large gaps or severe unevenness, preliminary treatment may be needed. Photos help us assess the surface, and we then tell you whether any preparatory steps are needed before bitumen is applied.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Is Al Amwaj within your service area?

Yes, Al Amwaj is one of the areas we work in, as are As Sufun, Ash Sheraa and Al Loaloa (near Dhahran). To start, call us or message us on WhatsApp.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Nearby areas

We also offer it in neighbouring areas

We also offer bitumen bathroom waterproofing in As Sufun, Ash Sheraa and Al Loaloa (near Dhahran), among the closest areas to Al Amwaj.

Other services in the area

More services in Al Amwaj

Pool at night with water jets after waterproofing

Your first step in Al Amwaj:
a call or a WhatsApp message

Call us or send photos of the floor, the pipe entries and the wall bases on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp