Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Ash Shati (near Tarout)

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Ash Shati (near Tarout)

We carry out bitumen bathroom waterproofing in Ash Shati, Al-Ahsa, beginning with photos of the wall bases and floor sent by call or WhatsApp. Bitumen goes down before the screed and tiles to keep water away from what lies beneath.

Ash Shati combines traditional and modern homes side by side, and its air is more humid than inland areas given its coastal character. Stains usually appear at corners and where the wall meets the floor, and older bathrooms may need preparation before lining. The photos will show whether bitumen alone suffices or whether joints must be repaired first.

  • Ash Shati is a residential district of Al-Ahsa in the Eastern Province, adjoining Al Fath, As Sahil and Al Manakh.
  • Humid air keeps bathroom surfaces wet for longer, so weak joints stay exposed to seepage.
What the service includes

What we do for you in Ash Shati (near Tarout)

  • Applying bitumen layers over the floor including the shower area
  • Confirming full drying before the screed is poured
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Closing the waterproofing around drain openings and pipe entries
How we work

The stages of the work in Ash Shati (near Tarout)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Your request from Ash Shati (near Tarout) comes to usCall or WhatsApp on one number, and we answer you ourselves.

Start from Ash Shati (near Tarout) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bitumen bathroom waterproofing in Ash Shati (near Tarout)

Does coastal humidity in Ash Shati affect bitumen waterproofing?

Humidity keeps the bathroom wet for longer, so drying and preparing the surface properly before application matters a great deal; the photos will indicate how much this is needed.

Which areas of Ash Shati bathrooms are lined first?

Usually the wall bases, the corners and their joints with the floor, since those are where water most often escapes; the whole floor is then covered depending on its condition.

What should I send you from Ash Shati (near Tarout)?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Ash Shati (near Tarout), and we will work out the next step with you.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Nearby areas

We also offer it in neighbouring areas

If the site is outside Ash Shati (near Tarout), the same service is available in Al Fath, As Sahil (near Tarout) and Al Manakh.

Other services in the area

More services in Ash Shati (near Tarout)

Pool at night with water jets after waterproofing

Bitumen bathroom waterproofing in Ash Shati (near Tarout)?
Call us now

Call us or send photos of the floor, the pipe entries and the wall bases on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp