
Bitumen bathroom waterproofing in Al Manakh
Bitumen waterproofing for bathrooms in Al Manakh starts when you send us photos of the bathroom floor and lower walls by call or WhatsApp. The district has modern and older villas and residential blocks, and each bathroom needs water protection suited to its location and the materials around it.
Al Manakh has older villas alongside newer residential blocks, with bathrooms of different sizes and build methods. An older bathroom may have a clay or plain concrete floor, while a newer one sits on different levels of moisture. Bitumen seals the floor and lower walls before finishing, keeping water out of deeper layers and adjoining walls, essential if the bathroom is on low ground or next to an external wall.
- Al Manakh is a district in the Eastern Province near Al Jabal, Ar Rabiiyah and Az Zomorod, with alternating villas and residential blocks.
- Bitumen must cover all the floor and lower walls that might be exposed to water before any screed or tiling is placed over it.
The bitumen bathroom waterproofing work in Al Manakh
- Applying bitumen layers over the floor including the shower area
- Cleaning the surface and treating cracks and corners before application
- Turning the layer up the walls in the wet zone and sealing the corners
- Checking the concrete floor and wall bases and identifying cracks
From first contact to the finished job in Al Manakh
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.
Start from Al Manakh with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
We serve Al Manakh and around itIncluding Al Jabal, Ar Rabiiyah (near Tarout) and Az Zomorod, as part of our work across the Eastern Province.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
Before you book bitumen bathroom waterproofing in Al Manakh
Do we need to dig out the old bathroom before applying bitumen?
Not necessarily. If the old floor is clean and solid, bitumen can be applied directly to it. The photos show the surface condition, and if weak sections need removing we will tell you first.
Does bitumen last for many years under the tiles?
Bitumen protects as long as the tiles and screed remain intact. If tiles crack or water enters from above, moisture can reach the bitumen layer. Proper drainage of shower water extends the life of the waterproofing.
What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?
Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.
What should I send you from Al Manakh?
Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Manakh, and we will work out the next step with you.
What decides the cost of bitumen waterproofing for a bathroom?
The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.
Why does bitumen need screed over it before tiling?
Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.
Areas near Al Manakh
We also work near Al Manakh, in Al Jabal, Ar Rabiiyah (near Tarout) and Az Zomorod.
More services in Al Manakh




