
Bitumen bathroom waterproofing in As Sulimaniyah
Bitumen bathroom waterproofing in As Sulimaniyah starts with photos of the bathroom floor and lower walls, sent by call or WhatsApp. The district has houses and villas with multiple bathrooms, and each floor needs a waterproof layer before tiling.
As Sulimaniyah has diverse homes, old and new, with bathrooms of different sizes and layouts. A floor bathroom in a house faces constant moisture from water and steam, and damp or leaks can appear if the floor is not treated before tiling. The thickness of bitumen and application method depend on the concrete's condition and existing slopes, and your photos show us the details we need to choose the right approach.
- As Sulimaniyah is a district in the Eastern Province, close to An Nuzhah, Al Faisaliyah and Ar Rabwah.
- A bathroom floor wetted daily needs strong waterproofing before tiling to prevent moisture problems later.
The main items of bitumen bathroom waterproofing in As Sulimaniyah
- Applying bitumen layers over the floor including the shower area
- Closing the waterproofing around drain openings and pipe entries
- Turning the layer up the walls in the wet zone and sealing the corners
- Checking the concrete floor and wall bases and identifying cracks
This is how we work in As Sulimaniyah
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.
Your request from As Sulimaniyah comes to usCall or WhatsApp on one number, and we answer you ourselves.
As Sulimaniyah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Your questions on bitumen bathroom waterproofing in As Sulimaniyah
What bitumen thickness is needed for a bathroom in As Sulimaniyah?
Thickness depends on the concrete condition, existing slopes and the bathroom design. Your photos show us all these details, and we choose the right thickness with you based on what we see.
Is bitumen alone enough or do we need extra layers?
It depends on the concrete floor condition and expected moisture levels. The photos and details you tell us help us decide whether one layer is enough or additional reinforcement is needed.
Do you offer bitumen bathroom waterproofing in As Sulimaniyah?
Yes. As Sulimaniyah is within our service area in the Eastern Province, and we also work in An Nuzhah (near Hafar Al-Batin), Al Faisaliyah (near Hafar Al-Batin) and Ar Rabwah (near Hafar Al-Batin). Call us or send photos of the spot on WhatsApp.
Does the bathroom need ventilation while bitumen is applied?
Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.
Why does bitumen need screed over it before tiling?
Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.
What decides the cost of bitumen waterproofing for a bathroom?
The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.
We also offer it in neighbouring areas
Nearby areas we also cover: An Nuzhah (near Hafar Al-Batin), Al Faisaliyah (near Hafar Al-Batin) and Ar Rabwah (near Hafar Al-Batin).
More services in As Sulimaniyah




