Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in As Sulimaniyah

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in As Sulimaniyah

Bathroom waterproofing in As Sulimaniyah begins with WhatsApp photos of the floor and wet walls. The district has houses and villas of varying size, each with bathrooms of different layouts that need a continuous waterproof membrane before tiles and adhesive are applied.

As Sulimaniyah has houses and villas with courtyards and bathrooms of old and new design. An older bathroom may have an uneven floor or one recessed below the adjacent room, requiring drainage planning, while a newer one may have taller walls needing the membrane applied higher. Coastal humidity raises the importance of a continuous membrane that stops water seeping into brickwork and plaster. The photos show the floor condition and planned tile type before we choose the membrane thickness.

  • As Sulimaniyah is a district in the Eastern Province near An Nuzhah, Al Faisaliyah and Ar Rabwah, with houses and villas featuring private courtyards.
  • A bathroom situated above living areas or storage requires special waterproofing to prevent damp from reaching the spaces below.
What the service includes

What the service covers in As Sulimaniyah

  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Forming and treating the floor-to-wall corners before the main layer
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
How we work

The stages of the work in As Sulimaniyah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Start from As Sulimaniyah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

As Sulimaniyah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing before tiling in As Sulimaniyah

Is a waterproof membrane necessary before tiles in a new bathroom in As Sulimaniyah?

Yes, a continuous membrane before tiles stops water seeping from tile grout and adhesive into the walls and foundation beneath the bathroom. Without it, damp and damage may appear within weeks of use.

How do we ensure the membrane covers all critical areas in the bathroom?

Send clear photos of the floor and where walls meet it, and tell us about drains or pipe entries. These photos help us plan membrane coverage for every corner and joint.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

Do you cover As Sulimaniyah?

Yes. We serve As Sulimaniyah and nearby areas such as An Nuzhah (near Hafar Al-Batin), Al Faisaliyah (near Hafar Al-Batin) and Ar Rabwah (near Hafar Al-Batin), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

Nearby areas

Bathroom waterproofing before tiling near As Sulimaniyah

Nearby areas we also cover: An Nuzhah (near Hafar Al-Batin), Al Faisaliyah (near Hafar Al-Batin) and Ar Rabwah (near Hafar Al-Batin).

Other services in the area

More services in As Sulimaniyah

Worker applying the white insulation layer on a villa roof by the sea

Your first step in As Sulimaniyah:
a call or a WhatsApp message

Describe the problem and where it is in As Sulimaniyah, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp