Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Umran

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Umran

Bitumen bathroom waterproofing in Al Umran starts with WhatsApp photos of the floor and walls before installation. The district has villas and residential buildings with bathrooms ranging from older to newer, each needing different preparation before the bitumen is applied.

Bathrooms in Al Umran villas vary in size and moisture depending on ventilation and use. Older floors and walls may retain water or show dampness at edges and corners, while newer ones may only need surface cleaning and dust removal. Bitumen is laid before screed and tiling to protect the building structure from water seeping through the floor and walls. Your photos help us understand the surface condition before choosing the right thickness and method.

  • Al Umran is a district in the Eastern Province, near Al Haoutah, Ar Rumailah and Tuwaythir, with villas and residential apartment buildings.
  • A bathroom with dampness or moisture needs surface drying and crack repair before bitumen is applied.
What the service includes

The bitumen bathroom waterproofing work in Al Umran

  • Checking the concrete floor and wall bases and identifying cracks
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Cleaning the surface and treating cracks and corners before application
  • Confirming full drying before the screed is poured
How we work

How we carry out bitumen bathroom waterproofing in Al Umran

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Al Umran is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We serve Al Umran and around itIncluding Al Haoutah, Ar Rumailah and Tuwaythir, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bitumen bathroom waterproofing in Al Umran

Is bitumen enough to protect an old bathroom in Al Umran?

It depends on the base condition. If the floor and walls are sound after damp is removed, bitumen provides effective protection before tiling. If there are deep cracks or damaged substructure, the photos will show this and we will advise you on what is needed.

How many photos do you need to assess a bathroom in Al Umran?

Send photos of the floor from different angles and the walls around the shower, toilet and sink, and any dampness or cracks you see. The clearer the photos, the better we can work out the right plan with you.

Is Al Umran within your service area?

Yes, Al Umran is one of the areas we work in, as are Al Haoutah, Ar Rumailah and Tuwaythir. To start, call us or message us on WhatsApp.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Al Haoutah, Ar Rumailah and Tuwaythir.

Other services in the area

More services in Al Umran

Pool at night with water jets after waterproofing

Your first step in Al Umran:
a call or a WhatsApp message

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp