Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Haoutah

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Haoutah

Bitumen bathroom waterproofing in Al Haoutah starts with photos of the floor and lower walls, sent by call or WhatsApp. The district has houses and villas on plots of varying size, where the bathroom needs a waterproof layer before screed and tiling.

Al Haoutah has spread-out housing and varied ages among its houses and villas. Older bathrooms often show damp marks on adjoining walls or seeping under the tiles, while newer ones may just need basic waterproofing before finishing. Moisture penetrates concrete and old bitumen easily, so a fresh layer must cover the floor, base and corners. Photos show the current surface condition and what repair is needed before waterproofing.

  • Al Haoutah is a district in the Eastern Province, lying close to Ar Rumailah, Al Umran and Al Markaz, with houses and villas on diverse plots.
  • A bathroom without proper bitumen waterproofing may leak water into the foundations and surrounding walls over time.
What the service includes

The bitumen bathroom waterproofing work in Al Haoutah

  • Confirming full drying before the screed is poured
  • Closing the waterproofing around drain openings and pipe entries
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Cleaning the surface and treating cracks and corners before application
How we work

This is how we work in Al Haoutah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

We serve Al Haoutah and around itIncluding Ar Rumailah, Al Umran and Al Markaz, as part of our work across the Eastern Province.

Al Haoutah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bitumen bathroom waterproofing in Al Haoutah

Do you waterproof bathrooms in Al Haoutah villas?

Yes, we serve Al Haoutah. Send photos of the bathroom floor and lower walls, and tell us whether there is a current leak or you are preparing a new bathroom.

What happens if we do not waterproof the bathroom before tiling in Al Haoutah?

Water will seep under the tiles and screed into the concrete and walls, causing damp, rot and long-term damage. Bitumen prevents this if applied before finishing.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Do you offer bitumen bathroom waterproofing in Al Haoutah?

Yes. Al Haoutah is within our service area in the Eastern Province, and we also work in Ar Rumailah, Al Umran and Al Markaz. Call us or send photos of the spot on WhatsApp.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Nearby areas

Bitumen bathroom waterproofing near Al Haoutah

Nearby areas we also cover: Ar Rumailah, Al Umran and Al Markaz.

Other services in the area

More services in Al Haoutah

Pool at night with water jets after waterproofing

Tell us about your site in Al Haoutah
and we will plan the next step with you

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp