Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Muruj (near Al Khafji)

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Muruj (near Al Khafji)

Bitumen bathroom waterproofing in Al Muruj begins with photos sent by WhatsApp or phone. The area has many and varied residential buildings, and their bathrooms need reliable protection for floors and wall bases before tile is set.

Al Muruj is a residential district with apartment blocks and villas on plots of varying size, some older and some newer. Bathrooms in old blocks may be cramped with uneven floors, and seepage can affect flats below. Newer villas have larger bathrooms but their joints and outlets differ. Bitumen before screed and tile protects the concrete and structures from water, and each case needs a photo assessment to set the right method.

  • Al Muruj is a district in the Eastern Province, close to the Eastern Arabian Gulf, Al Faisaliyah and the Western Arabian Gulf.
  • Residential blocks here have multiple bathrooms sharing drainage systems, so waterproofing protects the shared base from seepage between flats.
What the service includes

The main items of bitumen bathroom waterproofing in Al Muruj (near Al Khafji)

  • Cleaning the surface and treating cracks and corners before application
  • Closing the waterproofing around drain openings and pipe entries
  • Confirming full drying before the screed is poured
  • Checking the concrete floor and wall bases and identifying cracks
How we work

How we carry out bitumen bathroom waterproofing in Al Muruj (near Al Khafji)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

We serve Al Muruj (near Al Khafji) and around itIncluding Eastern Arabian Gulf, Al Faisaliyah (near Al Khafji) and Western Arabian Gulf, as part of our work across the Eastern Province.

Your request from Al Muruj (near Al Khafji) comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bitumen bathroom waterproofing in Al Muruj (near Al Khafji)

If the bathroom is in an old block in Al Muruj, do we need special treatment?

We may need to clean and repair cracks first before applying bitumen, depending on the concrete's condition. Send photos of the floor and walls so we can see any cracks or damage before we start.

Can we waterproof a bathroom in an existing villa in Al Muruj without breaking or removing old tile?

Bitumen is applied before new tile, so for full protection the old tile must be lifted first. If you want an alternative, send photos so we can discuss your options.

What should I send you from Al Muruj (near Al Khafji)?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Muruj (near Al Khafji), and we will work out the next step with you.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Nearby areas

Bitumen bathroom waterproofing near Al Muruj (near Al Khafji)

We also offer bitumen bathroom waterproofing in Eastern Arabian Gulf, Al Faisaliyah (near Al Khafji) and Western Arabian Gulf, among the closest areas to Al Muruj (near Al Khafji).

Other services in the area

More services in Al Muruj (near Al Khafji)

Pool at night with water jets after waterproofing

We start with you in Al Muruj (near Al Khafji)
with one call

Call us or send photos of the floor, the pipe entries and the wall bases on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp