Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Muruj (near Al Khafji)

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Muruj (near Al Khafji)

Bathroom waterproofing before tiling in Al Muruj begins with photos of the bathroom and its surroundings, sent by call or WhatsApp. Al Muruj has residential compounds with modern designs, where bathrooms need a durable waterproof membrane on the floor and walls before tiles are applied.

Bathrooms in Al Muruj compounds range from spacious master baths to small en-suite rooms, all needing a waterproof membrane that resists sustained moisture, heat and daily use. An older bathroom may have lost its waterproofing or been damaged by constant damp or pipe leaks, causing tiles to flake and the base to swell. The new membrane is chosen based on bathroom shape, location and how much the walls are exposed to water, and the photos determine whether the base is sound or needs prior treatment.

  • Al Muruj is a district in the Eastern Province, lying close to Al Faisaliyah and the Arabian Gulf.
  • A bathroom in a modern residential compound may need only the waterproof membrane replaced, while an older bathroom may require both the tiles and base to be removed.
What the service includes

The main items of bathroom waterproofing before tiling in Al Muruj (near Al Khafji)

  • Forming and treating the floor-to-wall corners before the main layer
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Applying the membrane over the full floor and up the walls in the wet zone
How we work

How we carry out bathroom waterproofing before tiling in Al Muruj (near Al Khafji)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

We serve Al Muruj (near Al Khafji) and around itIncluding Eastern Arabian Gulf, Al Faisaliyah (near Al Khafji) and Western Arabian Gulf, as part of our work across the Eastern Province.

Your request from Al Muruj (near Al Khafji) comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bathroom waterproofing before tiling in Al Muruj (near Al Khafji)

Does a newly built bathroom in Al Muruj need waterproofing before tiling?

Yes, even a newly built bathroom needs a continuous waterproof membrane on the floor and wet walls before adhesive and tiles. This stops water leakage and protects the structure from damp and cracking.

Why do tiles flake off in an older bathroom in Al Muruj?

Tiles flake because water seeps beneath them and weakens the base and adhesive. New waterproofing stops the leakage and allows safe, lasting retiling.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

Do you cover Al Muruj (near Al Khafji)?

Yes. We serve Al Muruj (near Al Khafji) and nearby areas such as Eastern Arabian Gulf, Al Faisaliyah (near Al Khafji) and Western Arabian Gulf, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

The same service in nearby areas

We also offer bathroom waterproofing before tiling in Eastern Arabian Gulf, Al Faisaliyah (near Al Khafji) and Western Arabian Gulf, among the closest areas to Al Muruj (near Al Khafji).

Other services in the area

More services in Al Muruj (near Al Khafji)

Worker applying the white insulation layer on a villa roof by the sea

Bathroom waterproofing before tiling in Al Muruj (near Al Khafji)?
Call us now

Describe the problem and where it is in Al Muruj (near Al Khafji), and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp