
Bitumen bathroom waterproofing in Al Matrafiyah
We carry out bitumen bathroom waterproofing in Al Matrafiyah once you send photos of the floor and wall bases by call or WhatsApp. Bitumen goes on before the screed and tiling, so the bathroom is protected from damp from the start.
Al Matrafiyah has multi-storey homes and small villas, and its bathrooms are often older or rebuilt without proper waterproofing. Damp usually appears at the wall bases and under the tiles, where water collects. The work depends on the floor as it stands, and the photos show whether it needs cleaning or repair before lining.
- Al Matrafiyah is a residential district of Dammam in the Eastern Province, close to Al Fasl, Al Firdaws and Al Farouq.
- A bathroom waterproofed before tiling keeps its protection better than one treated after the tiles are laid.
What we do for you in Al Matrafiyah
- Confirming full drying before the screed is poured
- Applying bitumen layers over the floor including the shower area
- Turning the layer up the walls in the wet zone and sealing the corners
- Checking the concrete floor and wall bases and identifying cracks
From first contact to the finished job in Al Matrafiyah
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.
Start from Al Matrafiyah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
We serve Al Matrafiyah and around itIncluding Al Fasl, Al Firdaws (near Al Fadili) and Al Farouq, as part of our work across the Eastern Province.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Common questions on bitumen bathroom waterproofing in Al Matrafiyah
Can an old bathroom in Al Matrafiyah be waterproofed without removing the tiles?
It depends on the tiles and the base under them. If the tiles are sound, less may be needed, but hollow areas or wide damp mean the base must be checked first, which the photos will help establish.
What is checked in Al Matrafiyah bathrooms before waterproofing?
We check the wall bases, the shower area, the floor level and any visible leak. These points decide the right method for your bathroom.
Do you offer bitumen bathroom waterproofing in Al Matrafiyah?
Yes. Al Matrafiyah is within our service area in the Eastern Province, and we also work in Al Fasl, Al Firdaws (near Al Fadili) and Al Farouq. Call us or send photos of the spot on WhatsApp.
Why does bitumen need screed over it before tiling?
Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.
What decides the cost of bitumen waterproofing for a bathroom?
The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.
Does the bathroom need ventilation while bitumen is applied?
Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.
Areas near Al Matrafiyah
We also work near Al Matrafiyah, in Al Fasl, Al Firdaws (near Al Fadili) and Al Farouq.
More services in Al Matrafiyah




