
Bitumen bathroom waterproofing in Al Farouq
Bitumen bathroom waterproofing in Al Farouq starts with a photo of the floor and lower walls, sent by call or WhatsApp. The district has residential buildings of varied ages, and bathroom protection before screed and tiling prevents water seepage later.
Al Farouq has diverse residential buildings, from older apartment blocks to newer houses and villas, with bathrooms of varying sizes and layouts. Both the tight bathroom in an old building and the spacious one in a modern villa need tight bitumen lining before screed. Water from the floor and walls, especially around drains and showers, can saturate the walls after completion if not sealed early. The photos show the surface condition and pipe locations before the method is chosen.
- Al Farouq is a district in the Eastern Province, close to Al Quds, Al Andalus and Al Firdaws, with residential buildings of mixed ages.
- A wet bathroom requires thick, well-applied bitumen around all openings and joints before any finish layer.
The bitumen bathroom waterproofing work in Al Farouq
- Turning the layer up the walls in the wet zone and sealing the corners
- Applying bitumen layers over the floor including the shower area
- Closing the waterproofing around drain openings and pipe entries
- Cleaning the surface and treating cracks and corners before application
The steps of bitumen bathroom waterproofing in Al Farouq
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.
Al Farouq is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
We serve Al Farouq and around itIncluding Al Quds, Al Andalus (near Al Fadili) and Al Firdaws (near Al Fadili), as part of our work across the Eastern Province.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Before you book bitumen bathroom waterproofing in Al Farouq
Must the entire bathroom floor be waterproofed in Al Farouq?
Yes, and the walls too up to a certain height. Water comes from the floor and lower walls together, especially at the shower and drain pipes. The photos show what boundaries must be sealed based on your bathroom's layout.
Is bitumen alone enough or does it need a second layer?
It depends on the application thickness and expected water pressure. Photos of the surface and pipes help us decide what is needed to ensure water does not seep before screed and tiling are laid.
Is Al Farouq within your service area?
Yes, Al Farouq is one of the areas we work in, as are Al Quds, Al Andalus (near Al Fadili) and Al Firdaws (near Al Fadili). To start, call us or message us on WhatsApp.
Why does bitumen need screed over it before tiling?
Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.
Does the bathroom need ventilation while bitumen is applied?
Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.
Is bitumen right for bathroom walls as well as the floor?
Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.
The same service in nearby areas
If the site is outside Al Farouq, the same service is available in Al Quds, Al Andalus (near Al Fadili) and Al Firdaws (near Al Fadili).
More services in Al Farouq




