Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Mashtal

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Mashtal

Bitumen waterproofing for bathrooms in Al Mashtal begins with a message containing photos of the floor, corners and lower walls, sent by call or WhatsApp. Al Mashtal is a residential district with older homes and refurbished ones, each needing strong protection before interior finishes.

Homes in Al Mashtal differ in age and condition, and older bathrooms suffer from water entry because original waterproofing has failed. New and refurbished bathrooms need a fresh bitumen layer before tiling. Walls and floors must be crack-free and clean before starting. Humidity and rare but strong rain increase strain on any gap in the waterproofing. Photos show whether cracks or leaks exist before waterproofing begins.

  • Al Mashtal is a residential district in the Eastern Province, near Al Qadih and Ash Shahba, with homes of various sizes.
  • A bathroom with water pooling or damp walls needs bitumen waterproofing before any other repair.
What the service includes

What we do for you in Al Mashtal

  • Closing the waterproofing around drain openings and pipe entries
  • Confirming full drying before the screed is poured
  • Applying bitumen layers over the floor including the shower area
  • Checking the concrete floor and wall bases and identifying cracks
How we work

This is how we work in Al Mashtal

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Your request from Al Mashtal comes to usCall or WhatsApp on one number, and we answer you ourselves.

Al Mashtal is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bitumen bathroom waterproofing in Al Mashtal

Can an old bathroom be waterproofed with bitumen without full demolition?

Yes if the concrete floor is sound. Current tiles must be removed and the surface cleaned of old tile and adhesive, then waterproofed with bitumen before new tiling. Send photos so we can see the concrete condition.

How many layers of bitumen does a bathroom floor in Al Mashtal need?

It depends on the floor condition and moisture levels in the area. Photos show whether there are deep cracks or old leaks, and help us choose the right number of layers to ensure protection.

What should I send you from Al Mashtal?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Mashtal, and we will work out the next step with you.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Nearby areas

Bitumen bathroom waterproofing near Al Mashtal

If the site is outside Al Mashtal, the same service is available in Al Qadih (near Al Awwamiyah), Ash Shahba and Al Qudayh (near Qatif).

Other services in the area

More services in Al Mashtal

Pool at night with water jets after waterproofing

In Al Mashtal and need bitumen bathroom waterproofing?
Send us photos of the spot

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp