Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Qadih (near Al Awwamiyah)

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Qadih (near Al Awwamiyah)

Bitumen bathroom waterproofing in Al Qadih starts with photos of the bathroom floor and wall bases, sent by call or WhatsApp. The district has houses and small residential buildings, and this layer is applied before the screed and tiling go in.

Al Qadih is made up mostly of houses, villas and small residential buildings, with bathrooms usually on a single floor or repeated across stacked units. Old tiling tends to crack at corners and around drains over time, letting water reach the layers beneath. The floor type and how the bathroom sits decide the right approach, and the photos show this before any step is chosen.

  • Al Qadih is a district in Al-Ahsa Governorate in the Eastern Province, lying close to Al Bahari, Ash Shahba and Al Mashtal.
  • Most bathroom leaks start at corners and drain joints rather than the middle of the floor.
What the service includes

The bitumen bathroom waterproofing work in Al Qadih (near Al Awwamiyah)

  • Closing the waterproofing around drain openings and pipe entries
  • Cleaning the surface and treating cracks and corners before application
  • Checking the concrete floor and wall bases and identifying cracks
  • Turning the layer up the walls in the wet zone and sealing the corners
How we work

The stages of the work in Al Qadih (near Al Awwamiyah)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

We serve Al Qadih (near Al Awwamiyah) and around itIncluding Al Qudayh (near Qatif), Al Bahari and Ash Shahba, as part of our work across the Eastern Province.

Your request from Al Qadih (near Al Awwamiyah) comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bitumen bathroom waterproofing in Al Qadih (near Al Awwamiyah)

Can bitumen be applied to a bathroom floor in Al Qadih before tiling?

Usually yes, applied before the screed and tiles. The photos will show whether the floor can take it directly or needs preparing first.

Which spots in Al Qadih homes need extra attention?

Usually wall bases, corners and around the drain, since these junctions are where water finds its way through. We check these spots in the photos first.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Is Al Qadih (near Al Awwamiyah) within your service area?

Yes, Al Qadih (near Al Awwamiyah) is one of the areas we work in, as are Al Qudayh (near Qatif), Al Bahari and Ash Shahba. To start, call us or message us on WhatsApp.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Nearby areas

The same service in nearby areas

If the site is outside Al Qadih (near Al Awwamiyah), the same service is available in Al Qudayh (near Qatif), Al Bahari and Ash Shahba.

Other services in the area

More services in Al Qadih (near Al Awwamiyah)

Pool at night with water jets after waterproofing

Bitumen bathroom waterproofing in Al Qadih (near Al Awwamiyah)?
Call us now

Describe the problem and where it is in Al Qadih (near Al Awwamiyah), and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp