
Bitumen bathroom waterproofing in Al Khunn
Bitumen bathroom waterproofing in Al Khunn starts with photos of the floor and lower walls, sent by call or WhatsApp. The village has houses of varying sizes, where bathroom waterproofing with bitumen before tiling protects against water seepage.
Al Khunn is a village with older and newer houses, each bathroom reflecting different ages and designs. The floor may be soil or concrete, and concrete walls readily absorb surrounding moisture, especially near drain pipes. Bitumen provides effective protection before screed and tiling are laid, and photos show the floor and wall condition and pipe locations to choose the method.
- Al Khunn is a village in the Eastern Province, near Al Ekhaa, Al Yasmin and Ash Shuruq, with scattered houses.
- A bathroom in a village house risks damp from the floor and walls because water pipes, especially older ones, may leak easily.
The bitumen bathroom waterproofing work in Al Khunn
- Applying bitumen layers over the floor including the shower area
- Cleaning the surface and treating cracks and corners before application
- Closing the waterproofing around drain openings and pipe entries
- Confirming full drying before the screed is poured
The stages of the work in Al Khunn
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.
Start from Al Khunn with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Al Khunn is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
Before you book bitumen bathroom waterproofing in Al Khunn
Must the old floor be removed before applying bitumen?
It depends on the floor and foundation condition. If the floor is stable it may only need cleaning and repair; if badly cracked it may need replacing. Photos will show which case it is.
Can bitumen waterproof a bathroom with old leaking pipes?
Bitumen protects the floor and walls from water, but leaking pipes themselves may need repair or replacement first. Send photos so we can tell you whether the pipes need attention.
Is Al Khunn within your service area?
Yes, Al Khunn is one of the areas we work in, as are Al Ekhaa, Al Yasmin (near Al Khunn) and Ash Shuruq (near Al Khunn). To start, call us or message us on WhatsApp.
What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?
Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.
Is bitumen right for bathroom walls as well as the floor?
Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.
Does the bathroom need ventilation while bitumen is applied?
Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.
We also offer it in neighbouring areas
We also offer bitumen bathroom waterproofing in Al Ekhaa, Al Yasmin (near Al Khunn) and Ash Shuruq (near Al Khunn), among the closest areas to Al Khunn.
More services in Al Khunn




