Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Ekhaa

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Ekhaa

Bitumen bathroom waterproofing in Al Ekhaa starts with photos of the bathroom and its details sent by WhatsApp or call. The area has villas and small multi-storey buildings, each with bathrooms that need water protection before finishing.

Bathrooms in Al Ekhaa vary in design and age, from newly built villas to older simple buildings. New villas may have level floors and clean concrete, while older buildings may show small cracks or old moisture marks. Bitumen is applied to protect the concrete surface from water seepage before the next layers go down. Photos of the floor and wall condition help choose the right approach.

  • Al Ekhaa is a district in the Eastern Province, near Al Yasmin, Ash Shuruq and Yabrin, with villas and small residential buildings.
  • Bitumen protects concrete from rising moisture in areas where floors are low or close to groundwater.
What the service includes

The main items of bitumen bathroom waterproofing in Al Ekhaa

  • Applying bitumen layers over the floor including the shower area
  • Confirming full drying before the screed is poured
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Cleaning the surface and treating cracks and corners before application
How we work

This is how we work in Al Ekhaa

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Start from Al Ekhaa with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Bitumen bathroom waterproofing in Al EkhaaWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bitumen bathroom waterproofing in Al Ekhaa

Do I need bitumen waterproofing if I am building a new bathroom in Al Ekhaa?

Yes, it is recommended. Even in new construction, bitumen provides a protective layer against water seepage before screed and tiling. Send photos of the new concrete so we can assess your needs.

How long after bitumen waterproofing can a bathroom be screed and tiled?

That depends on the product used and drying conditions. We will give you the details after reviewing your photos and agreeing on the method, since some materials take longer than others.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Do you cover Al Ekhaa?

Yes. We serve Al Ekhaa and nearby areas such as Al Yasmin (near Al Khunn), Ash Shuruq (near Al Khunn) and Yabrin (near Al Khunn), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Nearby areas

Bitumen bathroom waterproofing near Al Ekhaa

We also offer bitumen bathroom waterproofing in Al Yasmin (near Al Khunn), Ash Shuruq (near Al Khunn) and Yabrin (near Al Khunn), among the closest areas to Al Ekhaa.

Other services in the area

More services in Al Ekhaa

Pool at night with water jets after waterproofing

We start with you in Al Ekhaa
with one call

Call us or send photos of the floor, the pipe entries and the wall bases on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp