Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Khars

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Khars

Bitumen bathroom waterproofing in Al Khars begins with WhatsApp photos of the floor and lower walls. This district has scattered houses and villas on wide plots, where the bathroom needs protection before screed and tiling are laid.

In Al Khars, bathrooms vary between newly built and older ones, with sizes that depend on the house. Floors and lower walls face daily moisture, and can absorb dampness without waterproofing in place. The choice of bitumen method depends on the building stage and the surface type, and photos show the bathroom condition clearly before work begins.

  • Al Khars is a district in the Eastern Province with houses and villas on wide plots, situated close to Al Mubarraz and Al Mutayrifi.
  • In houses and villas, bitumen is applied to the floor and walls before screed is poured.
What the service includes

The scope of the work in Al Khars

  • Turning the layer up the walls in the wet zone and sealing the corners
  • Applying bitumen layers over the floor including the shower area
  • Confirming full drying before the screed is poured
  • Checking the concrete floor and wall bases and identifying cracks
How we work

The stages of the work in Al Khars

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Start from Al Khars with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from Al Khars comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bitumen bathroom waterproofing in Al Khars

Is bitumen waterproofing necessary before screed in bathrooms in Al Khars?

Yes, bitumen protects the concrete from water absorption in daily use and moisture. Applying it before screed is best. Send photos of the bathroom so we can advise you on the right method.

How many bitumen layers does a bathroom floor need in Al Khars?

It depends on the surface type and concrete condition; photos help us determine this. Usually, correct application according to the chosen method's specifications is sufficient.

Is Al Khars within your service area?

Yes, Al Khars is one of the areas we work in, as are Al Mubarraz (near As Saifa District), Al Mubarraz (near Al-Hofuf) and Al Mutayrifi. To start, call us or message us on WhatsApp.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Nearby areas

Bitumen bathroom waterproofing near Al Khars

Nearby areas we also cover: Al Mubarraz (near As Saifa District), Al Mubarraz (near Al-Hofuf) and Al Mutayrifi.

Other services in the area

More services in Al Khars

Pool at night with water jets after waterproofing

Bitumen bathroom waterproofing in Al Khars?
Call us now

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp