Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Khars

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Khars

Bathroom waterproofing before tiling in Al Khars starts with a WhatsApp message containing photos of the bathroom. The district has a mix of houses, villas and small blocks, with bathrooms varying by building type and age.

Bathrooms in Al Khars are found in many houses and villas and in scattered small blocks. Each bathroom needs a continuous waterproof membrane covering the floor and walls around water areas. Older concrete may show small cracks, and a new surface may be smooth. Photos show the surface condition so we choose the right membrane thickness and details before tiling.

  • Al Khars is a district in the Eastern Province near Al Mubarraz and Al Mutayrifi, with houses, villas and small residential blocks.
  • Houses and villas in Al Khars often have multiple bathrooms, each needing separate protection before tiling.
What the service includes

The bathroom waterproofing before tiling work in Al Khars

  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Forming and treating the floor-to-wall corners before the main layer
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Applying the membrane over the full floor and up the walls in the wet zone
How we work

The steps of bathroom waterproofing before tiling in Al Khars

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Al Khars is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We serve Al Khars and around itIncluding Al Mubarraz (near As Saifa District), Al Mubarraz (near Al-Hofuf) and Al Mutayrifi, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Khars

Do we waterproof an old bathroom in an existing villa or only new bathrooms?

Yes, we waterproof both old and new bathrooms. If you are renovating an old bathroom, send photos showing its condition, and we will determine the steps needed before the new membrane.

How long must we wait between membrane application and starting to tile?

That depends on the membrane type and drying conditions in the bathroom. We will tell you the required time after assessing the photos and location.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

How do I request bathroom waterproofing before tiling in Al Khars?

Call us, or send clear photos of the spot and its location in Al Khars on WhatsApp, and we will work out the next step with you.

Nearby areas

Areas near Al Khars

We also work near Al Khars, in Al Mubarraz (near As Saifa District), Al Mubarraz (near Al-Hofuf) and Al Mutayrifi.

Other services in the area

More services in Al Khars

Worker applying the white insulation layer on a villa roof by the sea

In Al Khars and need bathroom waterproofing before tiling?
Send us photos of the spot

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp