
Bitumen bathroom waterproofing in Al Khalidiyah District
Bitumen bathroom waterproofing in Al Khalidiyah District starts with photos of the floor and lower walls sent by phone or WhatsApp. The district has varied houses and villas, where each bathroom needs strong bitumen waterproofing before tiling and screed.
Al Khalidiyah District has varied residential buildings from independent villas to adjoining houses, each facing different challenges. Old bathrooms often show long-term damp marks and old seeping, while new ones need strong preventive waterproofing from the start. Bitumen covers the floor and walls from the base to a safe height, protecting against water entering the concrete and surrounding walls. Photos show the bathroom's current state and what repair or replacement is needed before new bitumen is applied.
- Al Khalidiyah District is a district in the Eastern Province, lying close to Juba District, Ladhah District and Al Bandariyah District, with varied houses and villas.
- Water penetrating weak or old bitumen may cause rot and gradual collapse of screed, tiles and concrete.
What we do for you in Al Khalidiyah District
- Applying bitumen layers over the floor including the shower area
- Closing the waterproofing around drain openings and pipe entries
- Checking the concrete floor and wall bases and identifying cracks
- Turning the layer up the walls in the wet zone and sealing the corners
From first contact to the finished job in Al Khalidiyah District
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.
Your request from Al Khalidiyah District comes to usCall or WhatsApp on one number, and we answer you ourselves.
Al Khalidiyah District is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Before you book bitumen bathroom waterproofing in Al Khalidiyah District
If the bathroom's bitumen is cracked, must everything be replaced?
Not necessarily. If the concrete and tiles are sound, we may remove only the damaged bitumen, clean the surface and apply fresh bitumen. Photos show the state of each part and what actually needs replacing.
How long does it take to waterproof a bathroom in Al Khalidiyah?
It depends on the surface state, bathroom size and condition. Photos and initial consultation show the details, and we can then tell you what is needed and what is involved.
Is bitumen right for bathroom walls as well as the floor?
Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.
What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?
Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.
Do you cover Al Khalidiyah District?
Yes. We serve Al Khalidiyah District and nearby areas such as Juba District, Ladhah District and Al Bandariyah District, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.
How do I know the bathroom was not properly waterproofed before?
Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.
We also offer it in neighbouring areas
We also offer bitumen bathroom waterproofing in Juba District, Ladhah District and Al Bandariyah District, among the closest areas to Al Khalidiyah District.
More services in Al Khalidiyah District




