
Bitumen bathroom waterproofing in Juba District
Bitumen bathroom waterproofing in Juba District begins with a WhatsApp message containing photos of the bathroom, space and current condition. The district has varied villas and buildings, and each bathroom may be in a different state requiring careful assessment before bitumen.
Villas and buildings in Juba District differ in size, design and age. Their bathrooms may be old, retaining dampness and moisture on walls and floors especially at corners and around fixtures, or newer, cleaner and easier to prepare. Bitumen is laid on a dry, clean and repaired surface before screed and tiling, to protect the base and walls from water seeping in. Detailed photos from different angles help us understand the surface condition and whether major repairs are needed before bitumen.
- Juba District is a district in the Eastern Province, near Al Mirqab District, Ladhah District and Al Marbidia District.
- A bathroom near external walls may face seasonal moisture, so ensuring a dry surface and sound bitumen is necessary for long-term protection.
The scope of the work in Juba District
- Turning the layer up the walls in the wet zone and sealing the corners
- Applying bitumen layers over the floor including the shower area
- Cleaning the surface and treating cracks and corners before application
- Closing the waterproofing around drain openings and pipe entries
The steps of bitumen bathroom waterproofing in Juba District
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.
Start from Juba District with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
We serve Juba District and around itIncluding Al Mirqab District, Ladhah District and Al Marbidia District, as part of our work across the Eastern Province.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in Juba District
Does a cold surface in winter affect bitumen application in Juba District?
Bitumen is laid on a dry surface, and warmth helps proper application and adhesion. If the bathroom is cold or damp, it must be dried and warmed first before bitumen. Tell us the bathroom condition so we can plan the right time.
Can you waterproof multiple bathrooms in the same villa in Juba District?
Yes, we waterproof multiple bathrooms. Send photos of each with a description of its condition, and discuss with us the sequence and time you need for completing each one separately.
Is bitumen right for bathroom walls as well as the floor?
Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.
Does the bathroom need ventilation while bitumen is applied?
Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.
Why does bitumen need screed over it before tiling?
Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.
Do you offer bitumen bathroom waterproofing in Juba District?
Yes. Juba District is within our service area in the Eastern Province, and we also work in Al Mirqab District, Ladhah District and Al Marbidia District. Call us or send photos of the spot on WhatsApp.
We also offer it in neighbouring areas
If the site is outside Juba District, the same service is available in Al Mirqab District, Ladhah District and Al Marbidia District.
More services in Juba District




