Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Iskan Second District

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Iskan Second District

Bitumen bathroom waterproofing in Al Iskan Second District starts with photos of the bathroom floor and wall bases, sent by call or on WhatsApp. The district is largely villas and houses on individual plots, where many bathrooms sit on the ground floor, so the photos will show how the floor meets the ground and the walls.

Al Iskan Second is mostly houses and villas on separate plots, and many bathrooms are on the ground floor with an external wall. A ground-floor bathroom floor sits directly on the slab, so the wall base at the outer walls is exposed to dampness rising or running in from outside. Villas often have bathrooms that were added later, where the bitumen layer and the screed were not planned together. The photos show whether the damp comes from the floor, the wall base, or the outside wall, and the treatment follows from that.

  • Al Iskan Second is a residential district of houses and villas in the Eastern Province, close to Ar Rabiyah and Al Danah.
  • A ground-floor bathroom beside an outer wall has to resist damp from two directions, the floor and the wall.
What the service includes

The bitumen bathroom waterproofing work in Al Iskan Second District

  • Turning the layer up the walls in the wet zone and sealing the corners
  • Cleaning the surface and treating cracks and corners before application
  • Checking the concrete floor and wall bases and identifying cracks
  • Confirming full drying before the screed is poured
How we work

This is how we work in Al Iskan Second District

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Bitumen bathroom waterproofing in Al Iskan Second DistrictWe choose the method and the materials once we know the condition of the spot.

Your request from Al Iskan Second District comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bitumen bathroom waterproofing in Al Iskan Second District

Does a ground-floor bathroom need more than a floor layer?

Often the wall base and the outer wall matter as much as the floor, because damp can reach a ground-floor room from either side. The photos will show where the moisture is, and the plan covers those places rather than applying a single layer everywhere.

Can a bathroom added to an older villa be treated this way?

Yes, it is a common situation in villas, and the photos will show whether the existing walls and floor are sound enough for bitumen. If the damp enters through an outer wall crack, we will tell you, since a bathroom layer alone will not solve that.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

How do I request bitumen bathroom waterproofing in Al Iskan Second District?

Call us, or send clear photos of the spot and its location in Al Iskan Second District on WhatsApp, and we will work out the next step with you.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

Nearby areas

Bitumen bathroom waterproofing near Al Iskan Second District

We also offer bitumen bathroom waterproofing in Ar Rabiyah District, Al Wurud Second District and Al Danah District, among the closest areas to Al Iskan Second District.

Other services in the area

More services in Al Iskan Second District

Pool at night with water jets after waterproofing

We start with you in Al Iskan Second District
with one call

Describe the problem and where it is in Al Iskan Second District, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp