Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Iskan Second District

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Iskan Second District

We waterproof bathrooms before tiling in Al Iskan Second District, Hofuf, starting with photos of the bathroom sent by call or WhatsApp. The district contains houses and villas of varied size, and its bathroom floors and wet walls need a continuous membrane before adhesive and tiles are applied.

Homes in the district include villas and houses with several bathrooms, and damp often appears in guest and staff bathrooms, which are used less and so dry slowly. Work starts by checking the floor and removing any loose material, then a continuous membrane is laid on the floor and the wet walls. The photos and the base condition show which bathroom needs work and how much.

  • Al Iskan Second District is a residential district in Hofuf, Al-Ahsa, in the Eastern Province, close to Al Wurud Second and Al Danah districts.
  • Rarely used bathrooms dry slowly, so damp shows up in them after a longer time than in main bathrooms.
What the service includes

The bathroom waterproofing before tiling work in Al Iskan Second District

  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Applying the membrane over the full floor and up the walls in the wet zone
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
How we work

The stages of the work in Al Iskan Second District

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Start from Al Iskan Second District with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from Al Iskan Second District comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing before tiling in Al Iskan Second District

Can a guest bathroom in Al Iskan Second District be waterproofed on its own?

Yes, each bathroom is treated separately according to its condition and size. Send photos of every bathroom you want treated and we will specify what each needs.

What should be done if damp returns after waterproofing in Al Iskan Second District?

Send photos of where the damp appeared and tell us when you noticed it. The cause may be a joint that was missed or an outside source, and the photos help tell the two apart.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

What should I send you from Al Iskan Second District?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Iskan Second District, and we will work out the next step with you.

Nearby areas

We also offer it in neighbouring areas

If the site is outside Al Iskan Second District, the same service is available in Ar Rabiyah District, Al Wurud Second District and Al Danah District.

Other services in the area

More services in Al Iskan Second District

Worker applying the white insulation layer on a villa roof by the sea

Tell us about your site in Al Iskan Second District
and we will plan the next step with you

Describe the problem and where it is in Al Iskan Second District, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp