Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Hamra (near Ghizlan)

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Hamra (near Ghizlan)

We waterproof bathrooms with bitumen in Al Hamra once photos of the floor and wall bases arrive by call or WhatsApp. Bitumen goes on before the screed and tiling, so the bathroom can cope with damp rising from the lower wall.

Al Hamra is made up of mid-sized homes and flats in multi-storey blocks, and some of its bathrooms are old and were never waterproofed. Near the coast the air stays humid, so lower walls can remain damp for longer. The work depends on where the damp sits and how much there is, which the photos reveal before any step is taken.

  • Al Hamra is a residential district of Dammam in the Eastern Province, close to Al Bahar, Al Salam and Ghirnatah.
  • Humid coastal air keeps lower walls damp for longer, increasing the need for lining that blocks rising damp.
What the service includes

What we do for you in Al Hamra (near Ghizlan)

  • Turning the layer up the walls in the wet zone and sealing the corners
  • Confirming full drying before the screed is poured
  • Applying bitumen layers over the floor including the shower area
  • Cleaning the surface and treating cracks and corners before application
How we work

From first contact to the finished job in Al Hamra (near Ghizlan)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Your request from Al Hamra (near Ghizlan) comes to usCall or WhatsApp on one number, and we answer you ourselves.

We serve Al Hamra (near Ghizlan) and around itIncluding Al Bahar (near Ghizlan), Al Salam (near Ghizlan) and Ghirnatah (near Ghizlan), as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bitumen bathroom waterproofing in Al Hamra (near Ghizlan)

Is bitumen suitable for damp bathrooms in Al Hamra?

Bitumen suits stopping rising damp from the floor and lower wall, and the photos show whether your case calls for it. Damp from outside leakage is sometimes treated differently.

Can old bathrooms in Al Hamra be waterproofed without a full renovation?

In many cases only the affected floor and wall sections need work, provided the base is sound. The photos define how much must be opened and reinstated.

Do you cover Al Hamra (near Ghizlan)?

Yes. We serve Al Hamra (near Ghizlan) and nearby areas such as Al Bahar (near Ghizlan), Al Salam (near Ghizlan) and Ghirnatah (near Ghizlan), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Nearby areas

Areas near Al Hamra (near Ghizlan)

We also offer bitumen bathroom waterproofing in Al Bahar (near Ghizlan), Al Salam (near Ghizlan) and Ghirnatah (near Ghizlan), among the closest areas to Al Hamra (near Ghizlan).

Other services in the area

More services in Al Hamra (near Ghizlan)

Pool at night with water jets after waterproofing

We start with you in Al Hamra (near Ghizlan)
with one call

Call us or send photos of the floor, the pipe entries and the wall bases on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp