Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Hamra (near Ghizlan)

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Hamra (near Ghizlan)

We line bathrooms in Al Hamra before tiling, to stop water reaching what lies beneath. Send photos of the bathroom by call or WhatsApp so we can establish what is needed.

Al Hamra is residential, with houses and mid-sized apartments of varying age. Older bathrooms often have tiles laid over an unsealed cement screed, making full lining the necessary choice. Newly built bathrooms are best lined directly before tiling. Photos are what decide the condition.

  • Al Hamra is a residential district in Al-Ahsa, close to Al Bahar, Al Salam and Ghirnatah.
  • Tiles laid over unsealed cement trap water underneath, so what lies below the tile is checked first.
What the service includes

The main items of bathroom waterproofing before tiling in Al Hamra (near Ghizlan)

  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Applying the membrane over the full floor and up the walls in the wet zone
How we work

This is how we work in Al Hamra (near Ghizlan)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Your request from Al Hamra (near Ghizlan) comes to usCall or WhatsApp on one number, and we answer you ourselves.

Bathroom waterproofing before tiling in Al Hamra (near Ghizlan)We choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bathroom waterproofing before tiling in Al Hamra (near Ghizlan)

Must old tiles be lifted to waterproof a bathroom in Al Hamra?

Not always. It depends on whether the layer beneath the tiles is sound, and the photos show this before any decision is made.

Do older bathrooms in Al Hamra need full lining?

Often yes, when the cement beneath the tiles is unsealed. Send photos of the floor and walls and we will decide with you whether partial repair is enough.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

Is Al Hamra (near Ghizlan) within your service area?

Yes, Al Hamra (near Ghizlan) is one of the areas we work in, as are Al Bahar (near Ghizlan), Al Salam (near Ghizlan) and Ghirnatah (near Ghizlan). To start, call us or message us on WhatsApp.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

Nearby areas

Areas near Al Hamra (near Ghizlan)

We also offer bathroom waterproofing before tiling in Al Bahar (near Ghizlan), Al Salam (near Ghizlan) and Ghirnatah (near Ghizlan), among the closest areas to Al Hamra (near Ghizlan).

Other services in the area

More services in Al Hamra (near Ghizlan)

Worker applying the white insulation layer on a villa roof by the sea

We start with you in Al Hamra (near Ghizlan)
with one call

Describe the problem and where it is in Al Hamra (near Ghizlan), and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp