Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Aziziyah First District

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Aziziyah First District

Bitumen bathroom waterproofing in Al Aziziyah First District starts with a photo of the floor and wall base sent by call or WhatsApp. The district has homes and villas of varying age and design, with bathrooms that differ in size, location and surrounding humidity, so the approach depends on the surface condition and existing materials.

Al Aziziyah First District has a mix of older and newer homes and villas, with bathrooms varying in size and with old or new flooring. Daily moisture and severe summer heat put stress on any waterproofing, and photos show whether damp is already present. Bitumen waterproofing before screed and tiles protects the structure from water ingress, and preparation steps vary depending on the floor condition and existing joints.

  • Al Aziziyah First District is a residential district in the Eastern Province near Al Hamra First District, with multi-storey homes and villas.
  • A bathroom in a home or villa faces daily water and moisture, so waterproofing before tiling prevents seepage into the layers beneath.
What the service includes

The scope of the work in Al Aziziyah First District

  • Confirming full drying before the screed is poured
  • Applying bitumen layers over the floor including the shower area
  • Checking the concrete floor and wall bases and identifying cracks
  • Cleaning the surface and treating cracks and corners before application
How we work

The stages of the work in Al Aziziyah First District

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Al Aziziyah First District is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Your request from Al Aziziyah First District comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bitumen bathroom waterproofing in Al Aziziyah First District

Can an old bathroom floor be waterproofed with bitumen?

Yes, if the concrete is sound and free of deep cracks. The floor is cleaned and any hairline cracks are treated before applying bitumen. Photos show whether the condition allows this or whether further work is needed.

How much bitumen is applied before tiling in a bathroom in Al Aziziyah?

The amount depends on the bathroom size and the condition of the floor and wall base. Photos sent to us help determine the right amount and materials to ensure full protection before screed and tiles.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Do you cover Al Aziziyah First District?

Yes. We serve Al Aziziyah First District and nearby areas such as Al Hamra First District, Government Departments Complex Second District and An Nayfiyah District, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

Bitumen bathroom waterproofing near Al Aziziyah First District

If the site is outside Al Aziziyah First District, the same service is available in Al Hamra First District, Government Departments Complex Second District and An Nayfiyah District.

Other services in the area

More services in Al Aziziyah First District

Pool at night with water jets after waterproofing

We start with you in Al Aziziyah First District
with one call

Describe the problem and where it is in Al Aziziyah First District, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp