
Bitumen bathroom waterproofing in Al Aziziyah (near Ghizlan)
Bitumen bathroom waterproofing in Al Aziziyah starts with photos of the bathroom floor and lower walls, sent by call or WhatsApp. The district has houses and villas of varying age, where bathrooms need protection before screed and tiling to prevent water seeping down into the structure below.
Bathrooms in Al Aziziyah range from old to new, with varying concrete and joint conditions. Older bathrooms often show minor cracks or damp around corners and joints, while newer ones may only need hairline cracks treated before waterproofing. Bitumen is applied to the floor and wall base to protect the structure from moisture penetration. The photos show the surface condition and required depth before the lining thickness and application method are chosen.
- Al Aziziyah is a district in the Eastern Province, close to Ishbiliyah, Qurtubah and Ghirnatah, with multiple houses and villas.
- Coastal humidity and seasonal changes underline the importance of waterproofing before the bathroom's final construction.
The scope of the work in Al Aziziyah (near Ghizlan)
- Applying bitumen layers over the floor including the shower area
- Confirming full drying before the screed is poured
- Turning the layer up the walls in the wet zone and sealing the corners
- Checking the concrete floor and wall bases and identifying cracks
How we carry out bitumen bathroom waterproofing in Al Aziziyah (near Ghizlan)
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.
Your request from Al Aziziyah (near Ghizlan) comes to usCall or WhatsApp on one number, and we answer you ourselves.
Start from Al Aziziyah (near Ghizlan) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Questions about bitumen bathroom waterproofing in Al Aziziyah (near Ghizlan)
When should bitumen be applied to a bathroom in Al Aziziyah?
Bitumen is applied after cleaning and repairing concrete cracks and defects, before screed and tiling. Photos show the current state and help us determine whether the concrete is ready or needs preparatory repairs.
Is bitumen enough for an older bathroom in Al Aziziyah showing damp?
This depends on the damp's source and the damage depth. Send photos of the damp and cracks, and we will tell you whether bitumen alone is sufficient or if other treatments are needed before waterproofing.
How do I know the bathroom was not properly waterproofed before?
Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.
What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?
Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.
Does the bathroom need ventilation while bitumen is applied?
Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.
Do you cover Al Aziziyah (near Ghizlan)?
Yes. We serve Al Aziziyah (near Ghizlan) and nearby areas such as Ishbiliyah (near Ghizlan), Qurtubah (near Ghizlan) and Ghirnatah (near Ghizlan), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.
Areas near Al Aziziyah (near Ghizlan)
We also offer bitumen bathroom waterproofing in Ishbiliyah (near Ghizlan), Qurtubah (near Ghizlan) and Ghirnatah (near Ghizlan), among the closest areas to Al Aziziyah (near Ghizlan).
More services in Al Aziziyah (near Ghizlan)




