Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Aziziyah (near Ghizlan)

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Aziziyah (near Ghizlan)

Bathroom waterproofing before tiling in Al Aziziyah starts with photos of the floor and wet walls sent by call or WhatsApp. The district has villas and apartment buildings; each bathroom differs in size and layout, and each needs a waterproof membrane before tiles are laid.

Al Aziziyah has varied residential buildings: villas with spacious bathrooms and apartment blocks with smaller ones. The principle is the same in each: floor and shower or bath walls must be covered by a waterproof membrane before tiling. The work plan varies depending on whether the bathroom is new or being renovated, and on the existing plumbing type; photos show how water flows and where it could leak if not properly sealed.

  • Al Aziziyah is a residential district in the Eastern Province, near other housing areas such as Ishbiliyah, Qurtubah and Ghirnatah.
  • A bathroom without waterproofing before tiling exposes the walls and structure beneath them to damp and seepage over time.
What the service includes

The main items of bathroom waterproofing before tiling in Al Aziziyah (near Ghizlan)

  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Forming and treating the floor-to-wall corners before the main layer
  • Cleaning the surface, removing loose parts and treating hairline cracks
How we work

The stages of the work in Al Aziziyah (near Ghizlan)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Your request from Al Aziziyah (near Ghizlan) comes to usCall or WhatsApp on one number, and we answer you ourselves.

Al Aziziyah (near Ghizlan) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing before tiling in Al Aziziyah (near Ghizlan)

Must old tiles be removed before waterproofing in Al Aziziyah?

If the old tiles are sound, removal may not be necessary, but if photos show damp or seepage beneath them, they must come off first to prepare the surface. Send photos of the bathroom's current state so we can plan with you.

How long does bathroom waterproofing take before tiling in Al Aziziyah?

Duration depends on bathroom size and surface condition. After reviewing the photos we will tell you the schedule; you must allow time for the membrane to dry before tiling begins.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

Do you offer bathroom waterproofing before tiling in Al Aziziyah (near Ghizlan)?

Yes. Al Aziziyah (near Ghizlan) is within our service area in the Eastern Province, and we also work in Ishbiliyah (near Ghizlan), Qurtubah (near Ghizlan) and Ghirnatah (near Ghizlan). Call us or send photos of the spot on WhatsApp.

Nearby areas

The same service in nearby areas

If the site is outside Al Aziziyah (near Ghizlan), the same service is available in Ishbiliyah (near Ghizlan), Qurtubah (near Ghizlan) and Ghirnatah (near Ghizlan).

Other services in the area

More services in Al Aziziyah (near Ghizlan)

Worker applying the white insulation layer on a villa roof by the sea

Your first step in Al Aziziyah (near Ghizlan):
a call or a WhatsApp message

Call us or send photos of the bathroom and the floor on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp