Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Awadiyah

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Awadiyah

Bitumen bathroom waterproofing in Al Awadiyah starts with photos of the bathroom floor and walls, sent by call or WhatsApp. Houses and villas scattered across the village stand on plots of varying size, and each bathroom needs bitumen lining before screed and tiling are laid.

Houses and villas in Al Awadiyah differ in age, size and layout, so the bathroom may adjoin the entrance or lie deep inside. Older bathrooms in the area sometimes suffer from sub-surface moisture or leaks from buried pipes, while newer ones need proper waterproofing from the start. Bitumen lining keeps water and damp from the concrete and protects the walls, and photos show the floor and joints so the bitumen site and thickness can be decided.

  • Al Awadiyah is a village in the Eastern Province, close to Al Marah, Al Oyun and Al Qarn, with houses, villas and small mosques.
  • An older house bathroom often shows damp marks under the tiles and salt stains on walls if it was not waterproofed before.
What the service includes

The scope of the work in Al Awadiyah

  • Confirming full drying before the screed is poured
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Cleaning the surface and treating cracks and corners before application
  • Closing the waterproofing around drain openings and pipe entries
How we work

This is how we work in Al Awadiyah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Start from Al Awadiyah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Bitumen bathroom waterproofing in Al AwadiyahWe choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bitumen bathroom waterproofing in Al Awadiyah

Do you remove old tiles before or after the bitumen layer?

Bitumen goes down before tiling. If old tiles exist, they are lifted first, then the floor is cleaned and cracks are repaired, then bitumen is applied, and finally new tiles are laid. Photos help us decide the order.

Is bitumen alone enough or do we need additional waterproofing?

Bitumen suits bathroom floors and wall bases when the surface is clean and cracks are repaired. Photos will show whether a deeper problem needs treatment before the bitumen is laid.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Do you cover Al Awadiyah?

Yes. We serve Al Awadiyah and nearby areas such as Al Marah, Al Oyun and Al Qarn, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Nearby areas

Bitumen bathroom waterproofing near Al Awadiyah

We also offer bitumen bathroom waterproofing in Al Marah, Al Oyun and Al Qarn, among the closest areas to Al Awadiyah.

Other services in the area

More services in Al Awadiyah

Pool at night with water jets after waterproofing

Bitumen bathroom waterproofing in Al Awadiyah?
Call us now

Call us or send photos of the floor, the pipe entries and the wall bases on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp