Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Awadiyah

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Awadiyah

Bathroom waterproofing before tiling in Al Awadiyah starts with photos of the space sent to us by call or WhatsApp. The village has scattered houses and villas where bathrooms need protection from damp before tiles and adhesive are laid.

Al Awadiyah features detached houses and villas with wide courtyards. Bathrooms vary greatly in size and design, some older and some newly built. Damp often appears under old tiles at the floor and corners, especially around shower areas. A new bathroom needs a moisture barrier before tiling begins to prevent later problems. Photos clarify the surface condition and wet areas to decide the best waterproofing method.

  • Al Awadiyah is a village in the Eastern Province, close to Al Marah and Al Oyun, comprising scattered houses and villas with small mosques.
  • A bathroom without a waterproof membrane before tiling will let water seep into the layers beneath over time.
What the service includes

What we do for you in Al Awadiyah

  • Applying the membrane over the full floor and up the walls in the wet zone
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
How we work

From first contact to the finished job in Al Awadiyah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

Start from Al Awadiyah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Bathroom waterproofing before tiling in Al AwadiyahWe choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing before tiling in Al Awadiyah

Can the moisture barrier be applied to an old bathroom floor in Al Awadiyah?

It depends on the current floor condition. If the existing tiles are strong and firmly bonded, we may work directly on them after cleaning. If tiles are loose or the base beneath is weak, the old tiles must be removed first. Photos will clarify the condition.

Which areas of the bathroom do you focus waterproofing on in Al Awadiyah?

We focus on the entire floor, walls around the shower, corners and joints. Areas near water sources need stronger protection to ensure complete damp prevention.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

What should I send you from Al Awadiyah?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Awadiyah, and we will work out the next step with you.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

Nearby areas

We also offer it in neighbouring areas

We also offer bathroom waterproofing before tiling in Al Marah, Al Oyun and Al Qarn, among the closest areas to Al Awadiyah.

Other services in the area

More services in Al Awadiyah

Worker applying the white insulation layer on a villa roof by the sea

In Al Awadiyah and need bathroom waterproofing before tiling?
Send us photos of the spot

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp