
Bathroom waterproofing before tiling in Ghunan
Bathroom waterproofing before tiling in Ghunan starts with photos sent by call or WhatsApp. Industrial coastal villages need a continuous waterproof membrane on bathroom walls and floor to stop water seeping before tiles are laid.
Ghunan is a village near the industrial zone and the coast, with houses and villas of different sizes and varied bathrooms. A coastal and industrial setting together means high humidity and sometimes other environmental stresses on walls and pipes. The waterproof membrane withstands daily water and moisture pressure and protects what lies beneath the tiles. Photos show the bathroom size, pipes and openings to choose the right membrane.
- Ghunan is a village in the Eastern Province, close to the Second Industrial Zone, West Al Aziziyah and Half Moon Beach, on the coast.
- Bathrooms near the coast and industrial areas need a stronger waterproof membrane to handle increased moisture.
What the service covers in Ghunan
- Leaving the membrane to dry and cure before adhesive and tiling begin
- Forming and treating the floor-to-wall corners before the main layer
- Cleaning the surface, removing loose parts and treating hairline cracks
- Sealing around the drain outlet, the door threshold and all pipe sleeves
How we carry out bathroom waterproofing before tiling in Ghunan
Send photos of the bathroom
On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.
Prepare the surface
The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.
Apply the membrane
The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.
Dry, then tiling begins
The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.
Why Abraj Al Azl?
Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.
Bathroom waterproofing before tiling in GhunanWe choose the method and the materials once we know the condition of the spot.
We serve Ghunan and around itIncluding second industrial (near Dhahran), West Al Aziziyah and Half Moon Beach, as part of our work across the Eastern Province.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in Ghunan
Does a new bathroom in Ghunan need waterproofing before tiling?
Yes, even in a new bathroom. A continuous waterproof membrane from the start ensures long-term protection from water and moisture leaks, especially in a coastal setting.
How do you choose the right membrane type for a bathroom in Ghunan?
Photos and the initial call help us understand the bathroom size, surface condition and setting. A coastal and industrial environment needs strong materials that withstand moisture and salt, and photos show everything we need to know.
How is the corner between the floor and the wall sealed?
The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.
How high up the wall does the membrane go?
It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.
Does the surface need to be completely dry before the membrane is applied?
Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.
How do I request bathroom waterproofing before tiling in Ghunan?
Call us, or send clear photos of the spot and its location in Ghunan on WhatsApp, and we will work out the next step with you.
The same service in nearby areas
We also work near Ghunan, in second industrial (near Dhahran), West Al Aziziyah and Half Moon Beach.
More services in Ghunan



