Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Ash Shuqayq

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Ash Shuqayq

Bathroom waterproofing before tiling in Ash Shuqayq starts with photos of the bathroom floor and wet-area walls, sent by call or WhatsApp. The district is mostly houses and villas, where bathrooms are added to upper floors or built on ground-floor slabs. Each bathroom is reviewed from those photos before a membrane is chosen.

Houses and villas in a district like this range from older family homes to newer builds, so bathroom floors and walls differ in age and finish. Where a bathroom was tiled directly onto an old screed, hairline cracks and worn grout can let water pass to the slab below. A continuous membrane applied before any adhesive goes on gives that layer a sealed surface to bond to, and wet-area walls get the same treatment at their base.

  • Ash Shuqayq is a district in the Eastern Province, lying close to Al Mutayrifi, Al Qurayn and Julayjilah.
  • A bathroom floor over old screed needs sealing before tiles go on, because adhesive alone does not stop water.
What the service includes

The main items of bathroom waterproofing before tiling in Ash Shuqayq

  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Forming and treating the floor-to-wall corners before the main layer
How we work

This is how we work in Ash Shuqayq

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Start from Ash Shuqayq with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Bathroom waterproofing before tiling in Ash ShuqayqWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing before tiling in Ash Shuqayq

Can an upper-floor bathroom in Ash Shuqayq be waterproofed?

Yes, where the structure is sound. The membrane is laid on the floor and walls before tiling, and the photos show whether the slab beneath needs repair first.

Are bathroom walls covered as well as floors here?

Wet-area walls are usually treated to the height where water splashes, such as around the shower. The photos of your walls and floor let us propose the extent needed for your bathroom.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

Do you cover Ash Shuqayq?

Yes. We serve Ash Shuqayq and nearby areas such as Al Mutayrifi, Al Qurayn and Julayjilah, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Al Mutayrifi, Al Qurayn and Julayjilah.

Other services in the area

More services in Ash Shuqayq

Worker applying the white insulation layer on a villa roof by the sea

Bathroom waterproofing before tiling in Ash Shuqayq?
Call us now

Describe the problem and where it is in Ash Shuqayq, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp