Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Qurayn

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Qurayn

In Al Qurayn we waterproof bathrooms before tiling with a continuous membrane on the floor and wet-area walls, starting from photos of the bathroom sent by call or WhatsApp. We serve Al Qurayn in the Eastern Province and use the photos to decide whether the walls need a membrane before tiles go on.

Al Qurayn is mostly standalone houses and villas on generous plots, and many of its bathrooms sit near kitchens or laundry areas. In homes with rear yards, water can sometimes run against the outside walls of the bathroom, so the membrane must extend far enough to stop it reaching inside. Bathrooms differ between ground and upper floors, and the photos show the differences.

  • Al Qurayn is a residential district of Al Khobar in the Eastern Province, close to Ash Shuqayq, Julayjilah and Ash Shibah.
  • Outside bathroom walls can meet water from rear yards, so the membrane extends onto them when needed.
What the service includes

The bathroom waterproofing before tiling work in Al Qurayn

  • Forming and treating the floor-to-wall corners before the main layer
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Applying the membrane over the full floor and up the walls in the wet zone
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
How we work

From first contact to the finished job in Al Qurayn

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Al Qurayn is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Bathroom waterproofing before tiling in Al QuraynWe choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing before tiling in Al Qurayn

Should the outside bathroom wall be waterproofed in Al Qurayn?

If water reaches it from the yard or laundry area, the membrane extends onto it. The photos show which wall is exposed and whether it needs protection.

Does a bathroom next to the kitchen in Al Qurayn affect the waterproofing?

Yes, since spilled water reaches the adjacent floor. We include the exposed zone in the membrane and explain this after reviewing the photos.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

What should I send you from Al Qurayn?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Qurayn, and we will work out the next step with you.

Nearby areas

We also offer it in neighbouring areas

Nearby areas we also cover: Ash Shuqayq, Julayjilah and Ash Shibah.

Other services in the area

More services in Al Qurayn

Worker applying the white insulation layer on a villa roof by the sea

Your first step in Al Qurayn:
a call or a WhatsApp message

Describe the problem and where it is in Al Qurayn, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp