Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Ar Rida

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Ar Rida

Bathroom waterproofing before tiling in Ar Rida begins with photos of the wet floor and walls sent by phone or WhatsApp. Ar Rida is a residential district with varied buildings, and each bathroom needs a tight waterproof layer before tiles are adhered and set.

Ar Rida contains houses of varied age and size, and their bathrooms differ in layout and condition. An older home's bathroom may suffer from damp or leaks due to missing waterproofing, while a newer one may only need the membrane renewed. Seasonal heat and humidity affect concrete and joint integrity, and photos clarify the level of deterioration and what treatment is needed before new tiling.

  • Ar Rida is a district in the Eastern Province near Al Wahah, Al Khuzama and Ash Shati, with numerous varied residential homes.
  • Water leaking from the bathroom to adjacent rooms occurs when there is no waterproof barrier under the tiles to stop it seeping through.
What the service includes

The scope of the work in Ar Rida

  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Applying the membrane over the full floor and up the walls in the wet zone
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Cleaning the surface, removing loose parts and treating hairline cracks
How we work

From first contact to the finished job in Ar Rida

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Start from Ar Rida with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Ar Rida is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing before tiling in Ar Rida

If a bathroom in Ar Rida is leaking water into an adjacent room, will waterproofing fix it?

If the leak is due to a missing waterproof membrane under the tiles, yes. But if it stems from concrete cracks or a pipe fault, those need fixing first. Photos help us identify the cause.

How long does it take to apply a waterproof membrane to a bathroom in Ar Rida?

It depends on the surface condition, bathroom size and whether old tiles need removing. The initial photos and call clarify what is needed and the sequence of steps.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

What should I send you from Ar Rida?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Ar Rida, and we will work out the next step with you.

Nearby areas

Bathroom waterproofing before tiling near Ar Rida

If the site is outside Ar Rida, the same service is available in Al Wahah (near Qatif), Al Khuzama (near Qatif) and Ash Shati (near Tarout).

Other services in the area

More services in Ar Rida

Worker applying the white insulation layer on a villa roof by the sea

In Ar Rida and need bathroom waterproofing before tiling?
Send us photos of the spot

Describe the problem and where it is in Ar Rida, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp