Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Wahah (near Qatif)

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Wahah (near Qatif)

We provide bathroom waterproofing before tiling in the Al Wahah district of Al-Ahsa, with a continuous membrane on the bathroom floor and wet-area walls before adhesive and tiles go on. Send photos of your bathroom by call or WhatsApp and we will define what you need together.

Al Wahah is mostly mid-sized houses and small villas in neighbouring blocks, with many single bathrooms on the ground floor. In ground-floor homes moisture sometimes rises from outside walls or from floors in contact with the soil, so this is checked before waterproofing. The work starts by confirming the source of the wetness, then the floor is covered with a continuous membrane that extends up the wet-area walls. The photos show whether the water comes from inside the bathroom or from elsewhere.

  • Al Wahah is a residential district of Al-Ahsa in the Eastern Province, close to Al Wurud, Ar Rida and Ar Rawdah.
  • Dampness in a ground-floor bathroom can come from an outside wall rather than the floor, so the source is checked before choosing a method.
What the service includes

What the service covers in Al Wahah (near Qatif)

  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Applying the membrane over the full floor and up the walls in the wet zone
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Cleaning the surface, removing loose parts and treating hairline cracks
How we work

From first contact to the finished job in Al Wahah (near Qatif)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

We serve Al Wahah (near Qatif) and around itIncluding Al Wurud (near Tarout), Ar Rida and Ar Rawdah (near Tarout), as part of our work across the Eastern Province.

Start from Al Wahah (near Qatif) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing before tiling in Al Wahah (near Qatif)

Can a ground-floor bathroom in Al Wahah be waterproofed if damp is coming through the wall?

Waterproofing alone may not be enough if the water comes through the outside wall. The photos first identify the source of the damp, and we then advise any additional treatment needed.

Does a membrane work for a ground-floor bathroom in Al Wahah near the soil?

It works for the floor and wet area inside the bathroom, but its suitability depends on the condition of the base and how it meets the ground, which the photos help establish.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

Is Al Wahah (near Qatif) within your service area?

Yes, Al Wahah (near Qatif) is one of the areas we work in, as are Al Wurud (near Tarout), Ar Rida and Ar Rawdah (near Tarout). To start, call us or message us on WhatsApp.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

Nearby areas

Bathroom waterproofing before tiling near Al Wahah (near Qatif)

If the site is outside Al Wahah (near Qatif), the same service is available in Al Wurud (near Tarout), Ar Rida and Ar Rawdah (near Tarout).

Other services in the area

More services in Al Wahah (near Qatif)

Worker applying the white insulation layer on a villa roof by the sea

Bathroom waterproofing before tiling in Al Wahah (near Qatif)?
Call us now

Call us or send photos of the bathroom and the floor on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp